My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-A TXU Gas Statmt of Intent
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2003
>
06 - June
>
2003-06-09
>
04-A TXU Gas Statmt of Intent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:23:31 AM
Creation date
5/28/2003 7:57:41 PM
Metadata
Fields
Template:
AGENDA
Item Number
4-A
AGENDA - Type
REPORT
Description
TXU Gas Statement of Intent
AGENDA - Date
6/9/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TARIFF FOR GAS SERVICE TXU GAS COMPANY <br /> <br /> RATE SCHEDULE: 15 Rate LEP - Line Extension Policy <br /> APPLICABLE TO: Entire System I REVISION: 0 <br /> DATE: <br /> <br /> EFFECTIVE DATE: PAGE: 3 OF 3 <br /> Standard Allowance = $5.00 x Annual Mcf <br /> <br /> Annual Mcr = Company's estimate of Commercial Customer's annual Mcr <br /> based on expected usage patterns and equipment data supplied <br /> by Commercial Customer. In no event shall Annual Mcr exceed <br /> 3,000 Mcf for purposes of determining the Standard Allowance. <br /> Industrial Extensions <br /> <br /> If Company, in its sole discretion, agrees to the requested extension, then Customer will (1) install all <br /> facilities required by Company that are necessary to provide service to Customer utilizing a Company- <br /> approved contractor, or (2) pay Company to install the necessary facilities. <br /> <br /> Extension of Pipeline Facilities <br /> <br /> If Customer wishes to connect directly to the TXU Pipeline System, then, if Company in its sole discretion <br /> agrees to the requested connection, Customer will pay all costs associated with the connection as <br /> determined by Company. <br /> <br /> Special Conditions <br /> <br /> In those areas governed by an existing franchise, nothing in this tariff is intended to supersede a provision <br /> of such franchise. <br /> <br />If the Company installs facilities, then Customer/developer must provide, without cost to Company, <br />suitable space on Customer's premises for installation of facilities and a cleared right-of-way or easement <br />for the installation of the facilities. If the Main Line or Service Line extension exceeds the allowable <br />footages as outlined in this Rate, or the soil is other than Normal Soil, then Customer/developer will be <br />responsible for additional costs associated with excess footage and/or non-Normal Soil conditions. The <br />additional costs associated with excess footage and non-Normal Soil conditions will be as calculated by <br />Company and will be reviewed periodically and updated accordingly. <br /> <br />All extensions are made to minimize the cost of such extension. <br /> <br />If facilities in excess of those necessary to serve Customer are installed, then a refund mechanism may <br />be instituted by Company to reimburse Customer for the difference between the cost of the facilities <br />needed to serve Customer's request and those actually installed, provided service in the area meets the <br />estimated usage levels furnished by Customer at the time of installation. <br /> <br />A Utilization Contract must be executed by the Customer/developer to be eligible for any refund. <br /> <br /> -33- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.