My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-B-(2) Water/Sewer
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2003
>
06 - June
>
2003-06-16
>
03-B-(2) Water/Sewer
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:21:08 AM
Creation date
6/13/2003 9:01:07 PM
Metadata
Fields
Template:
AGENDA
Item Number
3-B-(2)
AGENDA - Type
REPORT
Description
Issues discussed at prior metings of Water & Sewer Subcommittee
AGENDA - Date
6/16/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Special City Council Meeting <br /> September 19, 2002 <br /> Page 4 <br /> <br /> account for sidewalks, curbs, street and alley repair. Mr. Campbell said they <br /> were obligated to maintain good roads to their plant and to the master lift station. <br /> They also have concrete work that they do around the plant. It may not be a curb, <br /> but it will be like a curb where you knock-off something on one of the basins and <br /> have to do concrete repair. <br /> <br /> Mr. Campbell explained the $85,000 in the filter beds and valves account for the <br /> Water Production Department. He said that amount is to replace the effluent <br /> valve controllers on ten valves on the filters. Mr. Campbell said the new rules <br /> and regulations require that all of the filters be monitored continuously for the <br /> quality of the water output. If you surge the filters, then that water quality can <br /> go up and spike the controls that are on the filters, which were put on there eight <br /> years ago when the plant was modified. They are wearing out and they are going <br /> to upgrade them to better controls. <br /> <br /> Councilman McCarthy questioned the sidewalks, curbs, street and alley repair <br /> account again and Mr. Campbell advised that the street and alley repair is <br /> basically for materials that are put on the roads. After discussion, the City <br /> Council agreed by a show of hands to cut $6,000.00 from this account. <br />//~Councilman Plata questioned the Account for Sludge Removal at the Water ~ <br /> Treatment Plant. Mr. Campbell said two old settlement basins from the Maxey <br /> Water Plant were used when the sludge handling facility was put in. Workers <br /> cannot get the sludge out fast enough. Mr. Campbell said he wanted to put <br /> automatic sludge handling equipment in the bottom of those basins. This will <br /> scrape the sludge and keep it mixed up so it can be sprayed on the field. He said <br /> there is a new rule called the recycle rule. The water that goes around to <br /> backwash the filters goes to a sump and it is pumped back for the sludge to be <br /> removed out of it. Then the water is decanted over and goes back to the head of <br /> the plant for treatment. If you cannot take the sludge out of the pit efficiently <br /> then the water that comes back is a bad quality and they have to shut down the <br /> recycle system and dump it into the creek. If you dump into the creek, the water <br /> has to meet a certain quality. The city does not have the facility to treat water <br /> that goes to the creek so they have to make sure that they recycle all of the water. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.