Laserfiche WebLink
Regular City Council Meeting <br />May 12,2003 <br />Page 25 <br /> <br />anticipating finishing those by the end of this month. He said the next stage <br />will be to develop engineer designs for construction of a new street on <br />Hearne Street. Mayor Fendley said the construction will be this summer. <br />City Manager Malone informed the City Council that the start of <br />construction will depend on engineering and how long it takes to develop <br />that and what type problems they run into. He said a cost estimate will need <br />to be developed based on the engineering. The City Manager informed the <br />Council that they will be crossing a slab, which was part of the old cotton <br />compress, and they do not know what problems that will present in terms of <br />cost. He also said the consulting engineer has not been hired for that and it <br />is something that cannot be done in-house. <br /> <br />There being no further business, the meeting was adjourned. <br /> <br />CURTIS FENDLEY, MAYOR <br /> <br />ATTEST: <br /> <br />MATTIE CUNNINGHAM, CITY CLERK <br /> <br /> <br />