My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-C Health Cnt - Fluoridation
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2003
>
08 - August
>
2003-08-11
>
05-C Health Cnt - Fluoridation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:21:33 AM
Creation date
8/7/2003 10:49:02 PM
Metadata
Fields
Template:
AGENDA
Item Number
5-C
AGENDA - Type
RESOLUTION
Description
Purchase of equipment for fluoridation system.
AGENDA - Date
8/11/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. Conduct accelerated monitoring of PERFORMING AGENCY. Accelerated monitoring means more <br /> frequent or more extensive monitoring will be performed by RECEIVING AGENCY thaa would <br /> routinely be accomplished; <br /> J.Require PERFORMING AGENCY to obtain technical or managerial assistauce; <br /> <br /> K. Disallow requests for reimbursement by disapproving costs or fees submitted for payment or <br /> reimbursement by PERFORMING AGENCY; <br /> <br /> L. Establish additional prior approvals for expenditure of funds by PERFORMING AGENCY; <br /> <br /> M. Require additional, more detailed, financial and/or programmatic reports to be submitted by <br /> PERFORMING AGENCY; <br /> <br /> N. Demand repayment from PERFORMING AGENCY; <br /> <br /> O. Reduce the contract funding amount for failure to achieve or maintain the proposed level of service, to <br /> expend funds appropriately and at a rate which will make full use of the award, or to provide services as <br /> set out in the contract; and, <br /> <br /> P. Impose other remedies provided by law. <br /> <br />RECEIVING AGENCY will formally notify PERFORMING AGENCY in writing when a sanction is imposed <br />(with the exception of accelerated monitoring, which may be unannounced), stating the nature of the sanction(s), the <br />reasons for imposing them, the corrective actions which shall be taken before they will be removed and the time <br />allowed for completing the corrective actions, and the method, if any, of requesting reconsideration of the sanctions <br />imposed. PERFORMING AGENCY is required to file, within fifteen (15) days of receipt of notice, a written <br />response to RECEIVING AGENCY'S program/division that sent the notice, acknowledging receipt of such notice <br />and stating how PERFORMING AGENCY will correct the noncompliance or demonstrating in writing that the <br />findings on which the sanctions are based are either invalid or do not warrant the sanction(s). If RECEIVING <br />AGENCY determines that a sanction is warranted, and unless the sanction is subject to review (see Sanction <br />Review Article), RECEIVING AGENCY'S decision is final and PERFORMING AGENCY shall take corrective <br />action. <br /> <br />In an emergency, RECEIVING AGENCY may immediately terminate or suspend all or part of the contract, <br />temporarily or permanently withhold cash payments, deny contract renewal or future contract awards, or delay <br />contract execution, by delivering written notice to PERFORMING AGENCY, by any verifiable method, stating the <br />reason for the emergency action. <br /> <br />An "emergency" is defined as the following: <br /> <br />· PERFORMING AGENCY is noncompliant and the noncompliance has a direct adverse impact on the public or <br /> client health or safety. The direct adverse impact may be programmatic or financial, impacting health or safety <br /> by failing to provide services, providing inadequate services, providing unnecessary services, or utilizing <br /> resources so that the public or clients do not receive the ben~fits contemplated by the contract scope of work or <br /> performance measures; <br />· PERFORMING AGENCY fails to achieve a performance measure; <br /> <br />(LG$) GENERAL PROVISIONS Page 20 I 1/2001 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.