My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-F Owner Occ Program Design
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2003
>
08 - August
>
2003-08-11
>
05-F Owner Occ Program Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:21:11 AM
Creation date
8/7/2003 10:58:14 PM
Metadata
Fields
Template:
AGENDA
Item Number
5-F
AGENDA - Type
RESOLUTION
Description
Owner Occupied Rehabilitation Program Design Contract
AGENDA - Date
8/11/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 6 <br /> <br />DETERMINING WORK TO BE DONE WITH A CONSTRUCTION LOAN <br /> <br />6.1 Property Inspection <br /> <br />The Building Inspector or construction manager shall inspect the property along with the owner <br />and, shall prepare an inspection report which identifies each deficiency with respect to local <br />codes or TMCS, or other deficiencies which may be corrected through a rehabilitation loan. <br /> <br />6.2 Work Write-Up And Cost Estimate <br /> <br />A work write-up and cost estimate is a statement prepared by program administrator based upon <br />the property inspection report that itemizes all the rehabilitation or reconstruction work to be <br />done on the property, and includes an estimate of the cost of each item. The cost estimate shall <br />be reasonable and reflect actual costs prevailing in the locality for comparable work. This <br />document will be reviewed and signed by the City's Building Inspector and the Owner. <br /> <br /> -13- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.