Laserfiche WebLink
The contractor otherwise fails to comply with the requirements of this <br />policy. <br /> <br />In any instance in which the City Engineer determines a contractor should be <br />ordered to cease work, be disqualified from performing work by the day, or <br />be removed from the qualified contractors list, the City Engineer shall notify <br />the contractor of his action, specifying in said written notice his reasons for <br />his actions. If the contractor remedies to the City Engineer's satisfaction those <br />matters which prompted the City Engineer's actions, the City Engineer may, <br />in his discretion, reinstate the contractor. Otherwise, if the contractor fails to <br />remedy such matters to the City Engineer's satisfaction, the contractor may <br />seek appeal of the City Engineer's decision to City Council by filing a written <br />request for appeal with the City Manager within ten (10) days of receipt of the <br />City Engineer's notification of his action. Failure to timely appeal the City <br />Engineer's action shall preclude any further appeal for the contractor. Any <br />contractor removed from the list of qualified contractors shall remain removed <br />from said list for a minimum of one (1) year from the date of notification of <br />his disqualification. Thereafter, the contractor may apply to the City Engineer <br />for reinstatement on the list of qualified contractors and if his request for <br />reinstatement is denied, he may seek appeal of that decision in the same <br />manner as set out herein for the appeal of his original disqualification. <br /> <br />Section 8. Reporting to Ci~_ Council. <br /> <br />The City Engineer shall, on a quarterly basis, prepare a summary report for <br />presentation as an agenda item on a regular or special City Council meeting. Said <br />report shall summarize all of the work by the day projects performed during the <br />immediately preceding quarter. Such report shall as a minimum include a brief <br />description of the project, the status of the project, the contractor performing the <br />project, the cost incurred to date, both for materials and work, and any other <br />comments or information the City Engineer or the City Council deem appropriate. <br /> <br />Section 9. Departures from Polic_v. <br /> <br />A departure from this policy is permissible only upon specific approval for said <br />departure by official action of the City Council." <br /> <br /> Section 3. That all resolutions or portions of resolutions in conflict herewith, including <br />specifically Resolution No. 99-078, shall be and are hereby in all things repealed. <br /> <br /> Section 4. That the policy adopted herein shall be and become a portion of any procurement <br />manual hereafter adopted by the City of Paris. <br /> <br /> Section 5. That this resolution shall become effective immediately upon passage, with the <br />exception that the same shall not apply to any project currently under way at the time of its adoption. <br /> <br />-8- <br /> <br /> <br />