My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-A WTP Improvement Grant
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2004
>
01 - January
>
2004-01-28
>
02-A WTP Improvement Grant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:20:35 AM
Creation date
1/26/2004 11:04:32 PM
Metadata
Fields
Template:
AGENDA
Item Number
2-A
AGENDA - Type
RESOLUTION
Description
Grant application to Texas Water Development Board
AGENDA - Date
1/28/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
commitment based on preliminary engineering, environmental, economic and social <br />information. Because the DWSRF program is a reimbursement program due to U.S. <br />Environmental Protection agency requirements, DWSRF loans are closed in <br />installments. The interest rate is locked in at the first installment loan closing. Approved <br />applications typically receive a two-year commitment. The applicant's ability to repay the <br />loan is the major determining factor in the approval for using the pre-design funding <br />option. If the pre-design funding option is not used, the applicant must develop plans and <br />specifications and have them approved, obtain all necessary permits, and open bids <br />prior to closing the first installment of the loan. <br /> <br />FUNDING AND MONITORING: <br /> <br />Prior to loan closing, the applicant submits a final bond ordinance or resolution to the <br />TWDB for review and approval. The applicant's bond counsel arranges for the approval <br />of the debt by the Attorney General's office and the financial adviser schedules a closing <br />date for the exchange of debt for loan money. The applicant and TWDB staff monitor the <br />project during the construction process. Loans are monitored by TWDB staff for the life <br />of the outstanding debt to ensure compliance with the bond indenture requirements and <br />the maintenance of a sound financial condition. <br /> <br />ARE THERE ANY SPECIAL CONSIDERATIONS? <br /> <br />Applicants for loans greater than $500,000 must adopt a water conservation and drought <br />contingency plan (a statutory requirement). <br /> <br />A National Environmental Policy Act type environmental review is required by the <br />SDWA. TWDB staff is available to assist applicants in determining the scope of <br />investigation required, preparing reports, and coordinating with environmental regulatory <br />agencies. TWDB archeologists may also assist applicants by conducting necessary <br />archeological surveys, when appropriate, and securing regulatory agency approval. <br /> <br />WHAT ARE THE SPECIAL TERMS OF FINANCIAL <br />ASSISTANCE? <br /> <br />Security Instrument: Political Subdivisions will need to issue Bonds. Private and <br />Nonprofit organizations may issue contract. <br /> <br />Pledge: System revenues and/or tax pledges are typically required. Contract revenue <br />pledges for river authorities and others are possible. <br /> <br />Length of Loans: The maximum repayment period for a DWSRF loan is 20 years from <br />the completion of construction. Bonds may not be pre-paid (called) for approximately 10 <br />years (10 year call provisions). <br /> <br />Interest Rates: The DWSRF program can provide funds that are either from State <br />sources or funds directly made available by Federal capitalization grants. The Federal <br />Capitalization Grant funds result in an overall lower interest rate but requires additional <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.