My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
14-L Vulnerability Assessment
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2004
>
02 - February
>
2004-02-09
>
14-L Vulnerability Assessment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2012 3:53:11 PM
Creation date
2/6/2004 9:19:37 PM
Metadata
Fields
Template:
AGENDA
Item Number
14-L
AGENDA - Type
RESOLUTION
Description
Accept Proposal for Vulnerability Assessment Study
AGENDA - Date
2/9/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P RO] ECT T EAM <br />FREESE AND <br />NICHOLS: <br />HELPING YOU <br />PROTECT YOUR <br />WATER SUPPLY <br />Innovative approaches . . <br />EMOMII <br />Free" .na Nlehoh <br />practical results <br />Mr. Musallam has been a <br />~ Freese and Nichols, Inc. ~ <br />valuable asset as project <br />~ 4055 International Plaza, <br />Suite 200 <br />director on recent Vulnerability <br />Fort Worth, Texas 76109 <br />Assessments and Emergency <br />(817) 735-7455 (direct line) <br />Response Plans, including the <br />(817) 735-7300 (main line) <br />City of Beaumont and the City <br />of San Angelo, Texas. <br />Mr. Hutch Musallam, P.E., is a project director and manager for the water and <br />wastewater engineering group and the client representative for the City of Paris. He <br />specializes in water and wastewater treatment, biosolids dewatering and <br />management and hydraulic evaluations of treatment systems. As project director, <br />Mr. Musallam will facilitate the fulfillment of the project objectives and coordinate <br />all communication between FNI <br />8tld th2 Clty Of Pdl'IS. - Hisham (Hutch) Musallam P E <br />Ms. Tina E. Hanson, P.E., has taken an active role in the management of all of FNI's <br />VAs. She is an experienced project manager and water engineer and has managed <br />or been involved in each of FNI's water system VA projects. Prior to joining FNI, <br />Ms. Hanson conducted a VA for one of the state's largest water treatment facilities. <br />She has overseen the day-to-day technical, communication, schedule, budget and <br />contractual elements of these projects. Ms. Hanson has ensured that the VAs were <br />executed in an efficient and <br />successful manner. , Tina E. Hanson, P.E. <br />freese and Nichols, Inc. <br />Ms. Hanson serves as project 4055 International Plaza, <br />manager for the firm's water and suite 200 <br />wastewater engineering group. In Fort worth, Texas 76109 <br />this role, she routinely provides (817) 735-7349 (direct line) <br />conceptual, preliminary and final (81) 735-7300 (main line) <br />design for water and wastewater <br />projects throughout Texas. Her <br />background includes 17 years of environmental and civil engineering including VAs <br />and ERPs. She provides training, environmental assessments, feasibility studies, <br />remedial action plans, municipal solid waste, water and wastewater treatment <br />permitting, process evaluation, plant design, plant operation and maintenance, <br />sludge handling and disposal facilities industrial wastewater treatment facilities, and <br />construction management services. <br />Ms. Hanson and Mr. Musallam have successfully completed training in Risk <br />Assessment Methodology for water utilities and are RAM-W certified. Sandia <br />National Laboratories and AWWA Research Foundation developed the training. <br />Additional team members include Mr. Michael G, Morrison, P.E.; Mr. Russell <br />Redder, P.E.; Mr. Timothy E. Campbell, P.E.; Mr. Wade Zemlock; Mr. James <br />Humphrey; Mr. Thomas Haster, P.E.; and Mr. Russell Gibson, P.E. <br />Detailed information and qualifications can be found in individual resumes located <br />in the appendix. <br />Vulnerability Assessment and Emergency Response Plan SOQ page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.