Laserfiche WebLink
To: <br /> <br />From: <br /> <br />Subject: <br /> <br />Date: <br /> <br />MEMORANDUM <br /> <br />Michael Malone, City Manager <br /> <br />Terry Townsend, Director of Public Works <br /> <br />Bid Tabulation and Recommendation <br /> <br />February 13, 2004 <br /> <br />The following bids were received at a bid opening on Tuesday, February 3, 2004 at <br />3 p.m., for Flexible Base Material (Red Rock). <br /> <br />1.) Jackie Wheeler Construction <br /> Rt. 6 Box 6620 <br /> Paris, Texas 75462 <br /> <br />$8.25 per ton <br /> <br />2.) Martin Marietta Materials <br /> P.O. Box 219 <br /> Powderly, Texas 75473 <br /> <br />$8.85 per ton <br /> <br />! am recommending the low bid of $8.25 per ton from Jackie Wheeler Construction <br />accepted for Flexible Base Material (Red Rock). <br /> <br />These funds are budgeted in 2003-2004. <br /> <br />TT/as <br /> <br /> <br />