My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-D Police Facility Contract
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2004
>
03 - March
>
2004-03-08
>
05-D Police Facility Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2005 11:19:51 AM
Creation date
3/5/2004 1:55:32 PM
Metadata
Fields
Template:
AGENDA
Item Number
5-D
AGENDA - Type
RESOLUTION
Description
Amend Contract with Brinkley-Sargent on new PD facilities
AGENDA - Date
3/8/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Police and Cou Facility <br /> City of Paris <br /> Project Budget Notes <br /> March 3, 2004 <br /> <br />Note A: <br /> <br />Note B: <br />Note C: <br />Note D: <br /> <br />Note E: <br /> <br />Note F: <br /> <br />Note G: <br />Note H: <br />Note J: <br />Note K: <br />Note L: <br /> <br />Note M: <br />Note N: <br /> <br />Reference accepted pricing reductions dated October 2, 2003 (Exhibit A enclosed). <br />New roof will be an alternate to bid documents <br />Final cost provided by city. <br />Budget estimate based upon final scope of work. <br />Scope of work limited to interior courtyard at communications. City to provide all <br />remaining landscape work at site. <br />Final D.D. budget with all cuts included in Note A. Four dispatch stations and fixed <br />seats at courtroom. Police training to occur at briefing. <br />AN scope limited to courtroom requirements. No a/v included at courtroom for police <br />training. Police training a/v limited to roll-down screen <br />Budget not included in this scope of work. <br />CAT 5E cabling throughout with limited cable trays. <br />City budget for site paving materials. <br />Final negotiated contract based upon scope of work. <br />Site utilities by city. City to perform construction administration services from civil <br />contract. <br />Contingency moved to cover increase in furniture, IT and AA/budgets. <br />$4,000 added back for as-builts of existing facility. Final construction as-builts removed <br />from architectural contract. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.