My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-E Campbell Soup Contract
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2004
>
04 - April
>
2004-04-12
>
05-E Campbell Soup Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2005 11:15:46 AM
Creation date
4/6/2004 11:23:31 AM
Metadata
Fields
Template:
AGENDA
Item Number
5-E
AGENDA - Type
RESOLUTION
Description
Campbell Soup Contract
AGENDA - Date
4/12/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1.2 The potable water furnished shall be used exclusively for the operation of CAMPBELL's <br /> <br />manufacturing plant on the North side of Loop 286 N.W. within the corporate limits of the City of Paris. <br /> <br />II. Quantities To Be Furnished <br /> <br />2.1 The average daily supply of water furnished shall meet all reasonable requirements of <br /> <br />CAMPBELL, subject to such limitations and rates as are stated herein. The average monthly consumption, <br /> <br />at this time, is in excess of eleven (II) million cubic feet. The water delivered to CAMPBELL shall be at <br /> <br />a minimum pressure of seventy-five (75) pounds per square inch; the cost of delivering such pressure is <br /> <br />included in the rate established in Article VII. In no instance shall CAMPBELL require delivery of water <br /> <br />under this Agreement in an amount exceeding 8 million gallons per day, or at a rate exceeding 6000 gallons <br /> <br />per minute. <br /> <br />2.2 CAMPBELL will advise the CITY in advance in writing a minimum of sixty (60) days prior to <br /> <br />the implementation of any planned changes that would significantly affect the amount of water used by <br /> <br />CAMPBELL for any extended period of time. For the purpose ofthis Agreement, a significant effect would <br /> <br />be a change that would cause or contribute to Campbell's water consumption varying by 10% or more on <br /> <br />an average daily basis. For any changes such as these, the CITY will maintain the right to limit any <br /> <br />increase in water sold to CAMPBELL if it would adversely impact the integrity of the CITY's water <br /> <br />system. The CITY would then work with CAMPBELL, in good faith, to meet CAMPBELL's water needs. <br /> <br />III. Rel!ulations <br /> <br />3.1 CAMPBELL may not permit any water furnished hereunder to be used to supply any other party <br /> <br />without specific written approval of the City Council of the CITY. This shall not apply to emergency <br /> <br />service provided to other CITY water users. <br /> <br />IV. Ril!hts <br /> <br />4.1 The CITY reserves the right to inspect, test, repair and replace the water meter( s) used to measure <br /> <br />Water Purchase Contract - Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.