Laserfiche WebLink
"(b) Permit information. New significant industrial users shall file an application <br />in the form Prescribed by the City at least ninety (90) days prior to connecting to the <br />POTW. Any other non-domestic user shall file an application when notified within <br />ninety (90) days of receipt of notice to do so. In support of the application, the user <br />shall submit in units and terms appropriate for evaluation, the following information <br />as required by the supervisor: <br />"(1) a. Name, address and location (if different from the address). <br />"b. Authorized representative. <br />"(2) SIC number according to the Standard Industrial Classification <br />Manual, Bureau of the Budget, 1972, as amended; <br />"(3) Wastewater constituents and characteristics as determined by a <br />reliable analytical Laboratory; sampling and analysis shall be <br />performed in accordance with procedures established by the EPA <br />pursuant to Section 304(g) of the Act and contained in 40 CFR, Part <br />136, as amended. <br />"(4) Time and duration of contribution; <br />"(5) Average daily and fifteen-minute peak wastewater flow rates, <br />including daily, monthly and seasonal variations, if any; <br />"(6) Site plans, floor plans, mechanical and plumbing plans and details to <br />show all sewers, sewer connections and appurtenances by the size <br />and location and elevation; <br />"(7) A general description of activities, facilities and plant processes on <br />the premises including all materials which are or could be discharged <br />(including cleanup chemicals and washdown water) which make use <br />of, involve or incorporate any restricted, limited or prohibited <br />substances or toxic pollutants; <br />"(8) The nature and concentration of any pollutants in the discharge which <br />are limited by any City, state or federal pretreatment standards, and <br />a statement regarding whether or not the pretreatment standards are <br />being met on a consistent basis. If standards are not being so met, <br />whether additional operation and maintenance and/or additional <br />pretreatment is required for the user to meet applicable pretreatment <br />standards; <br />"(9) If additional pretreatment and/or operation and maintenance will be <br />required to meet the pretreatment standards, the schedule by which <br />the user will provide additional optimum pretreatment and/or <br />operation and maintenance. The completion date in this schedule <br />shall not be later than the compliance date established for the <br />20 <br />