My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
16-B Sewer Use Ord
City-of-Paris
>
City Council
>
Agenda Packets
>
2001-2010
>
2004
>
06 - June
>
2004-06-14
>
16-B Sewer Use Ord
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2012 3:41:39 PM
Creation date
6/9/2004 5:31:19 PM
Metadata
Fields
Template:
AGENDA
Item Number
16-B
AGENDA - Type
ORDINANCE
Description
Sewer Use Ordinance
AGENDA - Date
6/14/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
development, national categorical pretreatment standards, or best professional <br />judgment of the city. If state, federal, and local discharge limits are different, then <br />the most stringent limit shall apply. Dilution of the wastestream to achieve an <br />allowable discharge limit is prohibited. <br />"Milligrams per liter (mg/Z). A weight-to-volume ratio equivalent to parts per <br />million. <br />"National pollutant discharge elimination system (NPDES) permit. A permit <br />issued pursuant to Section 402 of the Act (33 USC 1342). <br />"Natural outlet. Any outlet into a watercourse, ditch, lake or other body of <br />surface water or groundwater. <br />"New source. Any user who commences discharge to the POTW after the <br />publication of a proposed federal pretreatment standard under section 307 (c) of the <br />Act applicable to such user and thereafter promulgated in accordance with that <br />section, provided that: <br />"(1) a. The facility is constructed at a site at which no other source is <br />located; or <br />"b. The facility totally replaces the process or production equipment that <br />causes the discharge of pollutants at an existing source; or <br />"c. The production or wastewater generating processes of the facility are <br />substantially independent of an existing source at the same time. In <br />determining whether these are substantially independent, factors such <br />as the extent to which the new facility is integrated with the existing <br />plant, and the extent to which the new facility is engaged in the same <br />general type of activity as the existing source should be considered. <br />"(2) Construction on a site at which an existing source is located results in a <br />modification rather than a new source if the construction does not create <br />a new building, facility or installation meeting the criteria of paragraphs <br />L(b) or (c) above, but otherwise alters, replaces or adds to existing <br />process or production equipment. <br />"(3) Construction of a new source as defined herein has commenced if the <br />owner or operator has: <br />"a. Begun, or caused to begin as part of a continuous onsite construction <br />program: <br />"1) Any placement, assembly or installation of facilities or <br />equipment; or <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.