My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-036 - Close out the contract, approve Change Order #1, decrease the contract amount by $2,114 and authorize final payment in the amount of $35,271.07 to B. Bray Construction for Phase 2 of the TWDB water line replacement project
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2014
>
2014-036 - Close out the contract, approve Change Order #1, decrease the contract amount by $2,114 and authorize final payment in the amount of $35,271.07 to B. Bray Construction for Phase 2 of the TWDB water line replacement project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 11:00:54 AM
Creation date
12/17/2014 12:28:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - Date
12/8/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br />Change Order #1 and Final <br />City of Paris <br />Phase II Water System Replacement <br />November 12, 2014 <br />Item # <br />Description <br />Quantity <br />Add /(Delete) <br />Unit Price <br />Total Change <br />B <br />2 <br />14" C -905 DR 18 PVC water line <br />12 <br />34.00 <br />408.00 <br />7 <br />6" SDR 26 Class 160 PVC sewer line <br />(20) <br />14.00 <br />(280.00) <br />8 <br />4" C -900 DR 18 PVC water line <br />(16) <br />12.00 <br />(192.00) <br />11 <br />12" Foster adapter <br />1 <br />230.00 <br />230.00 <br />12 <br />6" Foster adapter <br />(1) <br />120.00 <br />(120.00) <br />13 <br />4" Foster adapter <br />(1) <br />86.00 <br />(86.00) <br />20 <br />14" x 16" Tapping sleeve and valve <br />1 <br />2,300.00 <br />2,300.00 <br />24 <br />6" Tapping sleeve and valve <br />2 <br />2,100.00 <br />4,200.00 <br />25 <br />4" Tapping sleeve and valve <br />(1) <br />1,950.00 <br />(1,950.00) <br />26 <br />14" Butterfly valve <br />1 <br />2,950.00 <br />2,950.00 <br />27 <br />8" Gate valve <br />1 <br />1,200.00 <br />1,200.00 <br />28 <br />6" Gate valve <br />(1) <br />900.00 <br />(900.00) <br />32 <br />Connect to 2" & smaller existing lines <br />(3) <br />1,700.00 <br />(5,100.00) <br />34 <br />Line abandonment of existing 20" main <br />(7) <br />1,100.00 <br />(7,700.00) <br />36 <br />Long side water service transfer <br />5 <br />1,100.00 <br />5,500.00 <br />38 <br />Cap and abandon 6" line <br />(2) <br />150.00 <br />(300.00) <br />39 <br />Cap and abandon 4" line <br />(2) <br />114.00 <br />(228.00) <br />40 <br />Cap and abandon 2" line <br />(8) <br />112.00 <br />(896.00) <br />41 <br />Close valve, remove box, and repair asphalt <br />(7) <br />150.00 <br />(1,050.00) <br />43 <br />6" ARC coupling <br />(2) <br />50.00 <br />(100.00) <br />TOTAL CHANGE ORDER #1 AND FINAL <br />($2,114.00) <br />
The URL can be used to link to this page
Your browser does not support the video tag.