Page 2 <br />function, so 100% is going in to the volume component, as you can see <br />on page one; however, the treatment plant is a different situation <br />because the plant is designed not only to meet the strength loading <br />consisting of the BOD, TSS, and Ammonia loading, and what they have <br />done is to utilized the design criteria of the plant. Mr. Stowe said <br />they could go in and look at the specific assets that is within the <br />treatment plant and identify out of those investments in total how much <br />is related to each function, and as you can see, we have functionalized <br />the actual treatment plant for $4,380,805. - volume $602,384., BOD <br />strength $2,376,141., TSS strength $1,302,073., and NH3 strength <br />$100,207. Mr. Stowe said that page two was a recap of those figures. <br />Mr. Stowe said the next step, which is on page three, is the actual <br />development of the wastewater revenue requirements. The first item is <br />customer accounting, and in the budgeting process, this is captured <br />under water in total. Mr. Stowe asked the Committee to remember that <br />there was a reduction in Customer Accounting by $124,000. in the water <br />section, they are now moving that amount over to the sewer component so <br />that they can recognize it as a wastewater function. On the Wastewater <br />Treatment Plant, we have budgeted $664,985., there are several items <br />that needed adjusted, electricity $63,478., and building maintenance <br />$63,278. with a total adjustment of $791,471. The Sanitary Sewer has <br />been increased from $336,995. to $356,995. representing an increase of <br />$20,000. contributing to building maintenance. There were no <br />adjustments in the Lift Stations at this time. General Fund Support, <br />they identified $294,383. relating to the General Fund services <br />provided on behalf of the wastewater system and it's operation. Audit <br />fees, they picked up $5,000. which is only a reclassification, Debt <br />Service, you can see there was no adjustment. Mr. Stowe placed <br />emphasis on the present budget, the Capital Outlay for Wastewater <br />Treatment was $11,000. and Sanitary Sewer was $27,000. Mr. Stowe <br />stated that they were aware of the current EPA Order for the Wastewater <br />System, and they were waiting before finalizing this report, that City <br />Staff is working on a capital improvement program, which will address <br />some of the problems that are existing in the Wastewater Collection <br />system, but as Mr. Sarma highlighted there was 1.3% MGD a day as far as <br />inflow - infiltration, and based on our estimates of the cost at this <br />time for treatment that adequates for approximately $2,000.00 a day <br />due to the inflow - infiltration, so this is a number we have to be <br />aware of, and recognize the need to develop a plan and spend money that <br />is necessary to improve the system. Mr. Stowe said if the I & I could <br />be cut in half, from the 33.3% to 16 %, that would be saving of <br />$365,000. a year, this amount would finance approximately 3.5 million <br />dollars in improvements, in other words, the savings would pay for the <br />debt service. <br />Mr. Stowe referred to page four where you can see that the grant total <br />from what was budgeted 1.5 million dollars, it has been increased to <br />2.1 million dollars for revenue requirements for wastewater. The next <br />step is to functionalize these expenses which is shown on page 5. For <br />Customer Accounting, again this is a customer charge that flows <br />straight across, Wastewater Treatment total was $791,741. of which <br />$156,105. relates to volume, $355,251. BOD, $251,179. TSS, and $29,206. <br />NH3, Sanitary Sewer is a volume related item which is $356,995., Lift <br />