Laserfiche WebLink
ITEM <br />TREATMENT PLANT <br />COLLECTION SYSTEM <br />Y i S BILLING <br />CYIP <br />TOTAL <br />2�. s <br />TABLE R-S 8.2 <br />CITY OF PARIS <br />PLANT SUMMARY <br />$9,848,178 $6,000,241 $2,376,141 $1,302,073 $100,207 $69,516 <br />1) <br />BW TSS NH3 <br />TOTAL <br />VOLUME STRENGTH STRENGTH STRENGTH CUSTOMER <br />$4,380,805 <br />1602,384 $2,376,141 $1,302,073 $100,207 <br />5,047,982 <br />5,047, 982 0 0 0 <br />69,516 <br />69,516.00 <br />349,875 <br />349,875 <br />$9,848,178 $6,000,241 $2,376,141 $1,302,073 $100,207 $69,516 <br />1) <br />