My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-1991
City-of-Paris
>
Boards and Commissions
>
OTHER
>
WATER AND SEWER RATE STUDY COMMITTEE
>
1987-1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2015 3:33:11 PM
Creation date
2/2/2015 10:12:48 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br />W &S Rate Study Committee <br />Minutes 8/22/91 <br />The next large item is the Booster Pump Station Rehabilitation and <br />Addition of a 4.0 million gallon ground storage tank at an estimated <br />cost of $5,000,000.00. The total for all of the proposed project is <br />$14,526,000.00. <br />Page three of the handout, Mr. Reed pointed out was a budget comparison <br />for actual operating expenses for the water and wastewater operation <br />for the current year and the proposed 1991 -92 budget, which will be <br />presented to the Council for approval. The total cost of service shows <br />an increase of 15.24 %, with the debt service showing an increase of <br />40.20 %. <br />City Attorney Haynes pointed out that the Water Production, Sewer <br />Treatment, and Lift Stations Departments are intensive user of <br />electrical power. <br />Mr. Reed discussed lost and unaccountable water that is lost due to <br />fire fighting, water leaks, water main breaks, inaccurate meter <br />reading, meter stoppages, so what they had done was to see what type <br />system loss there was. On the handout showing Water Production, <br />Consumption and Losses in Gallons, Mr. Reed pointed out that just <br />because the City produces water through the Water Production Plant it <br />does not mean the City gets to sell all the water, and discussed the <br />types of water losses the City has. Mr. Reed told the Committee the <br />total system loss is 11.51 %. <br />Mr. Reed said the customers classes are broken down by residential, <br />commercial which is broken down further by small commercial and <br />industrial customers that have contracts, then we have Campbell Soup, <br />Tenaska, Merico, Lamar County Water Supply District which are contract <br />customers. Mr. Reed pointed out on the handout these customers classes <br />are broken down by total sales per month giving an annual total <br />consumption and the percentage of total water sold, giving an average <br />sale through out the year is 11.57 million gallons a day. Mr. Reed <br />told the Committee that the percentage of consumption by each class, <br />they should pay the same percentage ratio of all the treatment cost at <br />the plant, and stated that there are some of the cost that are <br />allocated by volume. <br />Mr. Reed said now that they have identified the budget, who is using <br />how much water, and based on the budget presented, operating & <br />maintenance portion, and debt service of $2,335,640.00, and the test <br />year assumption characteristics patterns for a twelve month period, <br />they have developed the proposed rates. Mr. Reed pointed out from the <br />handout the base amount for residential customers will be $5.64, and <br />included in that is 200 CF of water, and if they use more than 200 CF <br />of water they will pay $1.41 additional cost for each 100 CF. Mr. Reed <br />said for a 1" - 2" water meter the base cost of $15.25 for the first <br />1,000 CF, they will pay an additional cost of $1.31 for each 100 CF, if <br />they have a water meter greater than 2 ", and they are not qualified to <br />sign up for the industrial rates, you have to have a 4" meter to <br />qualify for the industrial rate, the base cost will be $39.45 for the <br />first 3,000 CF, an additional cost of $1.31 per 100 CF above the 3,000 <br />CF. <br />
The URL can be used to link to this page
Your browser does not support the video tag.