My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003
City-of-Paris
>
Boards and Commissions
>
OTHER
>
WATER AND SEWER SUBCOMMITTEE
>
2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2015 3:38:17 PM
Creation date
2/2/2015 10:56:23 AM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The cuts I have suggested are 13 employees cut from the water production and sewer <br />treatment plants as well as 2 cut from lift stations. These salaries along with the cuts from the <br />budget total around $ 600,000. <br />15 employees cut from budget @ 25,000 yearly 375,000 <br />20% benefits cut from budget 75,000 <br />valves eliminated from budget 100,000 <br />sludge removal equipment eliminated from budget 40,000 <br />new vehicle eliminated from budget 18,000 <br />.1: 111 <br />The new manpower schedule I have outlined will give the water production plant and the <br />water treatment plant coverage around the clock. It will put maintenance personnel on shift along <br />with a production operator. The personnel will go to a rotating shift which is a more economical <br />method of manning plants around the clock. Also this schedule would give three maintenance people <br />along with two production operators and a supervisor on days for any major breakdowns. Looking at <br />the maintenance breakdown sheets that was provided us by Herb,the manpower that will be allocated <br />to -the plants should be sufficient to handle any problems. Along with these cuts all of the tractors <br />and mowing equipment can be taken to the parks department. One riding mower,one push mower <br />and one weedeater can be left at the water production plant and at the sewer treatment plant so the <br />yards around the buildings and road can be maintained. The parks department could be grown by 4 <br />to 6 people so to be responsible for mowing the outlying fields at both the water production <br />plant,sewer treatment plant and the lift station areas. There is a big piece of property on center street <br />that was donated to the city for recreational purposes. Now is the time for a backstop to be put up <br />and maybe a couple of soccer goals so teams can have places to practice. Also when the sports <br />complex and the new police station come on line the personnel will hopefully be in place to provide <br />upkeep on grounds. <br />I have said before that I do not enjoy proposing job cuts but I feel that serious cuts are needed <br />to avoid raising rates too much. Also there is a more economical way to manage the water and sewer <br />plants and we should be striving to reach those goals. <br />
The URL can be used to link to this page
Your browser does not support the video tag.