My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003
City-of-Paris
>
Boards and Commissions
>
OTHER
>
WATER AND SEWER SUBCOMMITTEE
>
2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2015 3:38:17 PM
Creation date
2/2/2015 10:56:23 AM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water: <br />Supt. <br />Secretary <br />Foreman <br />2 -Chief Operators <br />11- Operators <br />16 <br />3 Operators Dedicated <br />to Maintenance and <br />fill in operations. <br />Lewisville, Texas <br />WW <br />Operations Supervisor (Supt) <br />Secretary (1/2) <br />Foreman <br />2 -Chief Operators <br />12- Operators <br />ii M. <br />Environmental Services. <br />Environmental Control Supervisor <br />Secretary (1/2) <br />3 -Lab Techs <br />3 -Env. Inspectors <br />Cost to treat water: $.89/1000 gallons <br />Cost to treat WW: $ 1.08/1000 gallons <br />Wastewater Plant Capacity: 12 MGD <br />15 MGD Expansion beginning in August, 2003 <br />WastewaterPlant Average Daily Flow: 8 MGD <br />Water Plant Capacity: 15 MGD soon to be 18 MGD <br />Average Daily Production: 13.25 MGD <br />Purchase Capacity: 12.4 MGD (From Dallas Water Utilities) <br />7.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.