My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003
City-of-Paris
>
Boards and Commissions
>
OTHER
>
WATER AND SEWER SUBCOMMITTEE
>
2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2015 3:38:17 PM
Creation date
2/2/2015 10:56:23 AM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />City of Paris <br />02 -18 -2003 Utilities Department <br />Lift Station Comparision <br />1987 <br />2003 <br />Changes: <br />Southeast <br />Southeast <br />MajorUpgrade plus Bypass Rentention Basin <br />Woodard <br />Woodard <br />MajorUpgrade plus Bypass Rentention Basin <br />Campbell <br />Campbell <br />Total Upgrade <br />Battle <br />Battle <br />Total Upgrade <br />Momingside(South) <br />Morn ingside(So uth) <br />Minor upgrade <br />Jefferson Heights <br />Jefferson Heights <br />Total Upgrade <br />Kimberly -Clark <br />Kimberly -Clark <br />Minor Upgrade <br />7th Southwest <br />Chisum <br />New Station (Larger) replaced 7th Southwest <br />Old Bonham Road <br />Old Bonham Road <br />Total Upgrade <br />Toco <br />Toco <br />Total Upgrade <br />City Lot <br />City Lot <br />Total Upgrade <br />Momingside (North) <br />New Station <br />Brownwood <br />New Station <br />Oakcreek <br />New Station <br />Stoneridge <br />New Station <br />EastGate <br />New Station <br />Amherst <br />New Station <br />(PGCC) <br />Proposed Station (O & M) <br />Additionally, between 1987 and 1990, a computerized Scada System was installed at each <br />lift station. This was monitored by WTP personnel at the WTP on a special computer. <br />Minor Upgrade means pumps and controls were overhauled and some new controls added. <br />Major Upgrade indicates that pumps were overhauled /upgraded /added, piping was changed <br />and new controls added. <br />Total Upgrade means all new pumps and controls and in some instances, new wetwells. <br />
The URL can be used to link to this page
Your browser does not support the video tag.