My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-2001
City-of-Paris
>
Boards and Commissions
>
OTHER
>
DRAINAGE COMMITTEE
>
2000-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2015 3:22:56 PM
Creation date
2/4/2015 3:27:41 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
600 Block Grand Street 20 <br />600 Block Bonham Street 100 <br />500 Block Lamar Street 25 <br />500 Block Clarksville Street 34 <br />I was hoping that I could report to you that most of the improvements in drainage would only <br />represent a small percentage of the overall drainage area. However, as can be seen above, that is not <br />the case in any of the locations. Even though 24' and Lamar has the smallest percentage increase, <br />it shows that nearly one fifth of the entire drainage basin above that point is more efficiently emptying <br />into the storm sewer system. <br />The 600 Block of Bonham is the worst case condition, practically all of the drainage system winds <br />up flowing overland to the curb and down to the inlet boxes at the low point in the drainage area. <br />Improving the inlets in this area might reduce the flooding experienced by Welch's Art Gallery, but <br />it would probably just move the flooding further downstream. (This last statement assumes'that the <br />existing brick storm sewer has excess capacity now to accept the additional load imposed on it by the <br />proposed curb inlets. Should the existing storm sewer not have this capacity then no amount of inlet <br />boxes will be able to push any more water into it than it is able to carry.) <br />It appears that if we were to install the proposed curb inlet boxes and grates that we would simply <br />add to the amount of water flowing in the storm sewer collection system downstream of that point, <br />assuming that the extra flow capacity was even available. Adding to that flow will surely add to the <br />flooding problems downstream. <br />I wish I could report better news to you, but I guess we both suspected it anyway. At least now we <br />have an idea of what we are up against. I will await your further instructions. Please give me a call <br />if you have any questions. <br />Sincerely, <br />HAYTER ENGINEERING <br />i9i9CI <br />Michael N. Tibbets, P.E. a2 D <br />Project Manager <br />MNT:mnt <br />C: WyFileslparislDrainage ProjectlTeny Townsend Janauary 2, 2001.wpd <br />OF <br />CV �i1YSi".S9CpCfjli� ��: <br />I iii. 1BBE:; <br />
The URL can be used to link to this page
Your browser does not support the video tag.