My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-2001
City-of-Paris
>
Boards and Commissions
>
OTHER
>
DRAINAGE COMMITTEE
>
2000-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2015 3:22:56 PM
Creation date
2/4/2015 3:27:41 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY COUNCIL DRAINAGE STUDY COMMITTEE MEETING <br />APRIL 19, 2001 <br />The City Council Drainage Study Committee met in a special session on <br />Thursday, April 19, 2001, 5:30 P. M. in the Conference Room/Break Room 150 <br />S. E. 1St Street, Paris, Texas. Chairman Benny Plata called the meeting to order <br />with Mayor Pro Tem Richard Manning and Councilman John Bell. Also present <br />were City Manager Michael E. Malone, Director of Public Works Terry <br />Townsend, and City Clerk Mattie Cunningham. <br />Chairman Plata announced that the first item on the agenda would be a review <br />of drainage repairs underway in the City of Paris. <br />Terry Townsend, Director of Public Works, discussed small drainage projects <br />that have been completed by contractors totaling $29,582.00 as follows: 6' S. <br />W. and Sherman; the 300 Block of Lamar Avenue (across from Tanglewood <br />Apartments); 32nd S. W. and Kaufman Street; 500 Block of Parr; 340, 350 and <br />42034 1h N. E.; 1000 Block of 201h N. E. The cost for these projects were paid <br />from the 2000 Certificates of Obligation. <br />Mr. Townsend also told the Committee that there were two jobs underway by <br />contractors and one is in the 300 Block of 31" Street S. E. with an estimated <br />completion cost of $28,870.00. Another project under way is at 19' N. W. and <br />Campbell and the estimated cost of this project is $13,790.00. <br />Mr. Townsend presented and discussed a list of future projects by contractors <br />consisting of the 500 Block of 26th S. E. estimated cost of $17,895.00; the 1000 <br />Block of East Jackson estimated cost of $33,407.00; 12th S. E. and Old Jefferson <br />Road estimated cost of $4,796.00; 16th S. E. and Simpson with an estimated cost <br />of $1,100.00. Mr. Townsend said the total cost for these projects was <br />$69,786.00. He also total the Committee that what is not included in this list is <br />the 42nd S. E. and Holbrook Project. Mr. Townsend told the Committee that he <br />was getting estimates from contractors for this project consisting of inserting a <br />liner in the present drainage pipe, patching holes ,landscaping, and demolition. <br />He was also getting estimates for the 42nd S. E. and Highway 82 to Old <br />Clarksville Road for researching easement, straightening the ditch out, re- cutting <br />
The URL can be used to link to this page
Your browser does not support the video tag.