My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/22/2013 MINUTES
City-of-Paris
>
Boards and Commissions
>
BUILDING AND STANDARDS COMMISSION
>
1979-2016
>
2013
>
01/22/2013 MINUTES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2017 3:04:41 PM
Creation date
2/10/2015 4:25:43 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
View images
View plain text
4. Discuss procedures concerning issuance of building permits on condemned <br />structures. <br />(1) Example: 47 NW 9th and 933 Connor. They had 30 days demo order put <br />on them. The owner came in and wanted permits to repair the structures and <br />Robert Talley let them pull the permits. After the permits were done the owner <br />didn't repair the properties correctly and we had to pull the permits and place a <br />stop work order on the properties. Do you want the structure to come back to BSC <br />or do you want Robert to handle the releasing and issuing permits? After much <br />discussion it was the majority that Robert Talley bring the properties back to BSC <br />and that this should be taken to the City Council for clear guidelines so the <br />Commission will have a consistent procedure. <br />(2) There always needs to be an updated Code Enforcement property list <br />attached to the BSC packets. <br />5. Future agenda items. <br />(1) Next meeting February 18, 2013. <br />6. Adjournment <br />Motion was made by Johnny Norris, seconded by Vicky Ballard to adjourn <br />the meeting at 4:13pm. Motion carried unanimously. 6 -0 <br />APPROVED THIS 18th DAY OF FEBRUARY 2013. <br />i rM. - RO) <br />W. m. <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).