Laserfiche WebLink
PART 6: NEW DEVELOPMENT <br />A. Please provide the following information for the total of all sewer line <br />extensions which were installed during the last year. <br />Design Population: 143 P.E. <br />Design Flow: .0143 MGD <br />Design BOD5:_ 250 mg /l <br />B. Has an industry (or other development) moved into the community or <br />expanded production in the.past year, such that either flow or pollutant <br />loadings to the sewerage system were significantly increased (5% or <br />greater)? (Circle One) <br />No = 0 points; <br />Yes '= 15 points <br />Describe: <br />List -any new pollutants: None <br />C. Is there. any development (industrial, commercial, or residential) <br />anticipated in the next 2 -3 years, such that either flow or pollutant <br />loadings to the sewerage system could significantly increase? <br />.(Circle One) <br />No = 0 points; Yes = 15 points <br />Describe: <br />List -any new pollutants: <br />D. Add together the point value circled in B and C and place the sum in the <br />blank below. <br />TOTAL POINT VALUE FOR PART 6 ( 0 <br />Enter this value on the point calculation table on the last page. <br />13 <br />