My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992
City-of-Paris
>
City Council
>
Minutes
>
1990-1999
>
1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2015 12:24:49 PM
Creation date
2/17/2015 12:32:06 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
759
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 9: SUBJECTIVE EVALUATION <br />A. Describe briefly the physical and structural conditions of the treatment <br />facilities: Initial construction 1940's with modifications in 1950's <br />.1972. 1986 1991 Facilities in good condition <br />B. Describe the condition of the collection /conveyance system including <br />lift stations (i.e.age of sewer, infiltration /inflow etc.) system consists <br />of 182.76 mi of 6" thru 30" sewers. Age varies from about 50 years old <br />to brand new. Significant work being done to eliminate major inflow <br />problems in oldest sections <br />C. What sewerage system improvements does the community have under <br />consideration for next 10 years ?Line segment replacements to renew old, <br />troublesome sections allowing inflow. <br />D. (1) List the theoretical design life of the plant._ 50 years <br />(2) List what you believe is the remaining useful life of the <br />wastewater treatment facilities in light of development and <br />maintenance /condition of the facilities: Approximately 20 years. <br />(3) Explain basis for estimate of remaining useful life: Assuming 5% <br />growth per year average, it would take approximately 20 years to <br />reach BOD, TSS capacity of plant from averages received today. <br />E. What problems, if any, have been experienced over the last year that <br />have threatened collection or treatment of wastewater? •A major flooding <br />incident prevented normal emergency response to widespread power outage <br />and lift stations. Modifications to emergency response-program will <br />prevent repeat occurrances. <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.