Laserfiche WebLink
ADDENDUM NUMBER ONE TO WATER PURCHASE CONTRACT <br />DATED APRIL 1, 1985, BETWEEN CITY OF PARIS AND <br />LAMAR COUNTY WATER SUPPLY DISTRICT, A <br />MUNICIPAL UTILITY DISTRICT <br />STATE OF TEXAS § <br />COUNTY OF LAMAR § <br />KNOW ALL MEN BY THESE PRESENTS That the CITY OF PARIS, <br />Paris, Texas, a municipal corporation, hereinafter called. <br />"CITY" and LAMAR COUNTY WATER SUPPLY DISTRICT, A MUNICIPAL <br />UTILITY DISTRICT, hereinafter called " LCWSD" do enter into <br />an addendum of the contract heretofore made by and between <br />these two parties dated April 1, 1985, reference to which is <br />made for all purposes,.the addendum being upon the terms and <br />conditions as follows:.- <br />1. LCWSD is granted the right by the- CITY to connect <br />a .16 inch water line to the CITY's - 30 inch water <br />transmission line at a point immediately West of the South <br />entrance gate to the Campbell Soup plant. This line shall <br />be constructed by LCWSD from that point to a point near the <br />existing master meter of LCWSD located on the North side of <br />FM Road 79, being a 16 inch main to the West Boundary Line <br />of , 19th Street Northwest and a 12 inch main from there to <br />the connection point at FM 79. <br />2.. The CITY agrees to procure all easements necessary <br />for laying the line along the route above stated.. <br />EMIBIT A <br />