My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987
City-of-Paris
>
City Council
>
Minutes
>
1980-1989
>
1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2015 1:04:40 PM
Creation date
2/18/2015 9:41:31 AM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
580
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF TEXAS (6 <br />COUNTY OF LAMAR: <br />THIS AGREEMENT, made the fourth day of June, in the year <br />of 1987, by and between the.City of Paris, acting by and <br />thru the Mayor, who has been duly authorized so to act, <br />hereinafter called the Owner, and the Danish Library Design <br />Bureau. Inc. of Houston, Texas, Viggo Torbensen, President, <br />hereinafter called the Contractor. <br />WITNESSTH, that the Owner and the Contractor for the <br />Considerations hereinafter named agree as follows: <br />ARTICLE I: SCOPE OF THE WORK: The Contractor shall furnish <br />all the materials and perform all the work shown and required <br />on the Drawings and described in the Specifications, entitled: <br />"Paris Public Library Furnishings," including all items on <br />Bid Schedule S1 through S26, CC1 -90, CC2 -60, SC1, SC2, SC3, <br />BT1, ND1, and B1, as prepared by William M. Lightfoot, AIA, <br />acting as and in these Contract Documents entitled the <br />Architect; and the Contractor shall do everything required <br />by the Contract Documents. <br />ARTICLE II: TIME OF COMPLETION: The work to be performed <br />under t is Contract shall be commenced on the date of Work <br />Order and shall be completed in eighty -four (84) calendar <br />days. Subject to. extensions of time as described in the <br />General Conditions, the Contractor agrees to pay the sum <br />of $75.00 (seventy -five dollars) per day, as liquidated <br />damages to the Owner for each calendar day thereafter that <br />the work remains incomplete. <br />ARTICLE III: THE CONTRACT SUM: The Owner agrees.to pay <br />the Contractor in current funds for the performance of <br />the Contract the sum of Seventy -Five Thousand,-Six Hundred <br />Twenty -Three and 65/100 Dollars ($75,623.65) subject to <br />additions and deductions as provided in the Specifications <br />and to the performance by the Contractor of all the terms <br />of this Contract. <br />ARTICLE IV: PROGRESS PAYMENTS: The Owner shall make pay- <br />ments on account of the Contract based on the Architect's <br />estimate of the value of work done and materials in place. <br />From the amount so ascertained, five percent (5%) will be <br />retained, less the aggregate of previous payments. <br />ACKNOWLEDGE: <br />OWNER <br />EXHIBIT A <br />
The URL can be used to link to this page
Your browser does not support the video tag.