My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
18 - DRAINAGE FUNDING OPTIONS
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2015
>
03 MARCH
>
03/09/2015
>
18 - DRAINAGE FUNDING OPTIONS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2015 9:30:31 AM
Creation date
3/6/2015 10:08:23 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sharing of costs. <br />The city shall share in the costs of the improvements with the owners of abutting properties, who in <br />turn shall, except as provided above, be assessed on a per foot share of total project costs as follows: <br />1. Street and alley improvements: <br />a. Front street: 50 percent (25 percent each side). <br />b. Side street: 25 percent (12.5 percent each side). <br />c. Rear street: 12.5 percent (6.3 percent each side). <br />d. Alley: 50 percent (25 percent each side). <br />2. Sidewalks: 50 percent. <br />3. Curbs and gutters: 50 percent. <br />4. Water lines: 66.7 percent (33.3 percent each side). <br />5. Wastewater lines: 66.7 percent (33.3 percent each side). <br />6. Fences and walls: 50 percent. <br />Assessments. <br />1. No assessment shall be made against any property or its owners in excess of the value of the special <br />benefits accruing to such property and its owners in enhanced value as determined by the city <br />council. <br />2. Assessments shall be due and payable upon final inspection and acceptance of the improvements by <br />the city. Assessments may be paid in whole or in not more than 24 monthly payments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.