Laserfiche WebLink
Item No. 9 <br />Buildings and Standards Report: July, 2015 <br />7 Structures were presented to the Buildings and Standards Commission: <br />1110 SE 3rd <br />141 NW 25th <br />2450 W Cherry <br />3380 NE Loop 286 <br />2245 S Church <br />546 E Hearon <br />6th SE & Jackson <br />4 Structures were demolished: <br />368 NE 1 st <br />925 SE 8th <br />619 Grove <br />1001 Grove <br />