My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-020 - Atmos franchise
City-of-Paris
>
City Clerk
>
Ordinances
>
2011-2020
>
2015
>
2015-020 - Atmos franchise
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 11:33:06 AM
Creation date
9/1/2015 12:58:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - Date
8/31/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L. Upon request by City, Company shall provide maps showing the location of its <br />System Facilities and cooperate in locating its System Facilities when necessary to avoid conflict <br />and protect the health and safety of the public. <br />SECTION 4. LAYING OF LINES IN ADVANCE OF PAVING. <br />A. Whenever City shall conclude to pave any Public Right -of -Way in which <br />Company's System Facilities already exist or in which Company may propose to install its <br />System Facilities, Company will be provided the opportunity, at no expense to City, in advance <br />of such paving to renew such System Facilities, if defective or inadequate in size, and to lay <br />System Facilities, or renew same, if inadequate in size or defective, to the property lines where <br />buildings are already located. <br />B. At least ninety (90) calendar days prior to the planned paving or repaving of <br />Public Rights -of -Way, City shall give Company written notice of the intention of City to pave <br />any such Public Right -of -Way. Upon receipt of such notice, Company shall initiate its review <br />process to determine the need to renew its System Facilities, and the need to lay or renew service <br />lines underneath the portions of the Public Rights -of -Way to be paved. If Company determines <br />such a need, Company shall promptly initiate such work and shall thereafter proceed in a good <br />faith and workmanlike manner to completion of the necessary work within ninety (90) calendar <br />days after receipt of the notice from the City. Company's failure to complete the necessary work <br />within the ninety (90) day period may be excused at the City's discretion, if Company has <br />promptly notified the City of the circumstances that have caused the delay, and has requested an <br />extension of the construction period. City shall grant the extension unless withheld for good <br />cause. <br />C. If Company should fail to take advantage of the pre - paving opportunity to <br />undertake new construction or repairs to existing System Facilities in the Public Rights -of -Way <br />to be paved, and such street or alley is thereafter paved, except in an emergency or in response to <br />a request for initiation of new service, Company's ability to thereafter cut or excavate in such <br />pavement shall be governed by the provisions of Chapter 29, Streets, Sidewalks, & Certain Other <br />Public Ways and Property, Paris City Code. <br />Page 8 <br />4340964.4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.