My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004
City-of-Paris
>
City Council
>
Minutes
>
2000-2009
>
2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2015 4:25:54 PM
Creation date
9/1/2015 2:42:29 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1802
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br />Soup, the 10 MGD to the City and the 5 MGD to Lamar County, that is a total <br />of 23 MGD. <br />Councilman Bell indicated that was the peak, not the average. Mayor Fendley <br />indicated that the water contracts included Kimberly - Clark, Campbell's Soup <br />and Tenaska. City Engineer Napier indicated these were the three major <br />industrial users and the study basically looked at these. <br />City Attorney Schenk said the Freese and Nichols letter used the number 26.5 <br />MGD. <br />Councilman Bell asked how much Lamar County asked for. <br />City Attorney Schenk explained the current contract with them says the City is. <br />obligated to provide them with a maximum of 5 MGD. The study indicated <br />there were administrative considerations in that number that may cause Lamar <br />County to require more water just for their current customers. <br />City Engineer Napier explained that Lamar County has an exception with <br />TCEQ. TCEQ requires most everyone to apply .6 gallons per minute per <br />connection and Lamar County is currently at .35gallons per minute per <br />connection. <br />He related that sometimes TCEQ goes back and looks at the past record of water <br />usage, and that would probably go up because of some drought years. He <br />figured it could go up to as much as 9 MGD. <br />City Attorney Schenk said that did not necessarily mean they would use that <br />much, but they would have to contract to meet the State regulations, to have the <br />availability of that water. <br />City Manager Malone continued that this means the City would have to have the <br />capacity to serve them and that is why the production study was done. He <br />indicated that Lamar County has already said they want more water. <br />
The URL can be used to link to this page
Your browser does not support the video tag.