My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997
City-of-Paris
>
City Council
>
Minutes
>
1990-1999
>
1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2015 9:30:30 AM
Creation date
9/2/2015 9:29:48 AM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br />705 <br />7.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on <br />the Contract Documents with respect to existing Underground Facilities at or contiguous to <br />the site and assumes responsibility for the accurate location of all Underground Facilities, <br />whether indicated in the Contract Documents, or not. No additional examinations, <br />investigations, explorations, tests, reports, studies or similar information or data in respect of <br />said Underground Facilities are, or will be, required by CONTRACTOR in order to perform <br />and furnish the Work at the Contract Price, within the Contract Time and in accordance with <br />the other terms and conditions of the Contract Documents. <br />7.5 CONTRACTOR has correlated the results of all such observations, examinations, <br />investigations, explorations, tests, reports and studies with the terms and conditions of the <br />Contract Documents. <br />7.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies <br />that he has discovered in the Contract Documents and the written resolution thereof by <br />ENGINEER is acceptable to CONTRACTOR. <br />7.7 CONTRACTOR has reviewed and fully agrees to the limitation of liability provisions included <br />in the Supplementary Conditions. <br />Article 8. CONTRACT DOCUMENTS <br />The Contract Documents which comprise the entire agreement between OWNER and <br />CONTRACTOR concerning the Work consist of the following: <br />8.1 This Agreement <br />8.2 Bid and Bid Schedule, Advertisement, and Information or Instructions to Bidders. <br />8.3 Performance and Payment Bonds <br />8.4 Notice of Award and Notice to Proceed <br />8.5 General Conditions and modifications thereto, if any, such are included. <br />8.6 • Supplementary Conditions <br />PSA Engineering in <br />association with dated <br />_ <br />8.7 Technical Specifications prepared or issued by Hayter Engineering n / � <br />8.8 Drawings, consisting of sheets numbered E1 through E9 , inclusive with each sheet. <br />bearing the following general title: Cox Field - Paris Municipal Airport <br />Airfield Lighting Improvements TxDOT Project #CSJ 9601PARIS <br />8.9 Addenda numbers 1 to _1_ inclusive. <br />8.10 Documentation submitted by CONTRACTOR prior to .Notice of Award, identified as <br />5% Bid Bond <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.