Laserfiche WebLink
731 <br />XI. ITEMIZED BUDGET. List below a schedule of itemized activities and the cost of each activity. <br />Provide as much detail as possible. <br />BUDGET <br />DESCRIPTION OF WORK ESTIMATE <br />DIVISION 1 GENERAL REQUIREMENTS $ 158,010.00 <br />SCHEDULES, REPORTS, & PAYMENTS, SHOP DRAWINGS, SUBMITTALS, <br />TESTING, QUALITY CONTROL SERVICES, TEMPORARY FACILITIES <br />PROJECT COMPLETION, HAZARDOUS MATERIALS MITIGATION <br />DIVISION 2 SITEWORH $ 46,161.00 <br />ASPHALTIC PAVING, SIDEWALKS, SITE DRAINAGE, SEWAGE PIPING <br />LANDSCAPING & DEMOLITION <br />DIVISION 3 CONCRETE $ 569.25 <br />CONCRETE. SELF - LEVELING UNDERLAYMENTS <br />DIVISION 4 MASONRY $ 15,611.25 <br />REPAIR AND REPLICATION, CLEANING <br />DIVISION 5 METALS $ 0.00 <br />STRUCTURAL STEEL, METAL FRAMING & FABRICATIONS, <br />ORNAMENTAL METALS <br />DIVISION 6 WOOD & PLASTICS $ 103,212.50 <br />ROUGH CARPENTRY, FINISH CARPENTRY $ 107,870.00 <br />DIVISION 7 THERMAL & MOISTURE <br />BITUMINOUS MEMBRANE WATERPROOFING, INSULATION, ROOFING, <br />FLASHING, JOINT SEALERS <br />DIVISION 8 DOORS & WINDOWS $ 50,181.40 <br />WOOD DOORS, WOOD WINDOWS, DOOR HARDWARE, <br />WINDOW HARDWARE, GLAZING $ 172,103.25 <br />DIVISION 9 FINISHES <br />PLASTER, GYPSUM BOARD, TILE, WOOD FLOORING, RESILIENT FLOORING <br />PAINTING, WALL COVERINGS, WOOD REFURBISHMENT <br />DIVISION 10 SPECIALTIES - $ 8,337.50 <br />TOILET COMPARTMENTS & ACCESSORIES <br />DIVISION 11 EQUIPMENT & FURNISHINGS $ 0.00 <br />NOT USED <br />DIVISION 14 CONVEYING SYSTEMS $ 0.00 <br />HYDRAULIC ELEVATOR & FIRE ESCAPES <br />DIVISION 15 MECHANICAL $ 153,122.50 <br />MECHANICAL, INSULATION, FIRE PROTECTION, PLUMBING, <br />HVAC, TESTING <br />DIVISION 16 ELECTRICAL $ 112,245.75 <br />ELECTRICAL MATERIALS & METHODS, SERVICE, <br />LIGHTING, LIGHTING CONTROLS / <br />TOTAL ESTIMATED CONSTRUCTION COST $ 927,424.40 <br />DESIGN, ENGINEERING, CONTINGENCIES, TXDOT ADMINISTRATIVE <br />EXPENSE AND OTHER COSTS ASSOCIATED WITH THE DEVELOPMENT V <br />AND IMPLEMENTATION $ 185,484.88 <br />TOTAL ESTIMATED CONSTRUCTION COST & ADMINISTRATION $1,112,909.28 <br />// <br />�V <br />^'tatewide Transportation Enhancement Program Page B7 <br />2 - --�- <br />