Laserfiche WebLink
EXHIBIT A <br />Description of Projects to be Refinanced by the <br />Issuance of the Bexar County Health Facilities <br />Development Corporation Incarnate Word <br />Health Services Revenue Refunding Bonds Series 1993 <br />With regard to Santa Rosa: <br />The Project consists of two parts. The first and major part was the <br />construction of Saint Rose Catholic Hospital, a complex to be located adjacent <br />to the Medical Center's existing Villa Rosa Hospital. The second part of the <br />project consisted of the renovation of certain spaces at the Downtown Facilities <br />and at Villa Rosa Hospital. <br />The new construction of Saint Rose Catholic Hospital provided 104 <br />medical /surgical beds, 50 rehabilitation medicine beds. 20 pediatric beds and <br />26 obstetric and ICU /CCU beds. Upon completion of the Project, 150 beds were <br />relocated from the Medical Center's Downtown Facilities to Saint Rose Catholic <br />Hospital. The total net increase in the Medical Center licensed beds was 20 <br />rehabilitation beds, for a total licensed capacity of 1,118 beds. Upon the <br />relocation of the 150 beds to Saint Rose Catholic Hospital, Villa Rosa Hospital <br />became primarily a psychiatric care facility and the Villa Rosa Hospital laboratory <br />was converted as part of the total Project to provide a model apartment for <br />rehabilitation patients, additional physician office space and several classrooms <br />and offices. <br />With regard to St. Joseph: <br />Proceeds of outstanding bonds, together with funds of the Hospital, <br />were used to finance the acquisition and /or construction of various assets, as <br />set forth below (the 'Project"): (i) construction of an additional floor for <br />administrative offices, a relocated and expanded pharmacy, physical therapy <br />area and an outpatient oncology area; (ii) construction of an additional floor for <br />a new 14 bed oncology unit; a 18 bed rehabilitation unit and 7 relocated <br />medical - surgical beds; (iii) renovation of the existing ICU and expansion of the <br />unit from 12 to 15 beds; (iv) the addition of twenty medical - surgical beds and <br />the construction of an addition for ambulatory care patients and (v) a new seven <br />story elevator tower. The Project required additional movable medical <br />equipment for physical therapy and major non - medical equipment including <br />elevators and an energy management system. <br />With regard to St. Anthony: <br />The construction of a new 70 -bed patient care tower so as to provide for the <br />addition of 40 new inpatient medical /surgical beds and the conversion of 30 existing <br />inpatient semi - private medical /surgical beds to private room beds, plus the relocation <br />of four existing medical /surgical beds. <br />The construction of new outpatient service facilities, including a new <br />main entry, admissions and registration area, patient screening and preparation <br />A -1 <br />INCu83-320005T -JOS HES CC P.SEX <br />12/07!92:17 - <br />X} A <br />