Laserfiche WebLink
i.2.4. Provide smoke testing and other field services as further described <br />in Exhibit A hereto. <br />The duties and responsibilities of ENGINEER during the System Inspection <br />w Phase are amended and supplemented as indicated in Exhibit A "Further <br />r— Description of Basic Engineering Services and Related Matters ". <br />1.3. Preliminary Design & Field Surveys Phase <br />After written authorization to proceed with this phase, ENGINEER shall: <br />1.3.1. Perform-on-the-ground surveys to develop more. detailed drawings <br />for certain portions of the project, as further described in Exhibit A <br />hereto. <br />1.3.2. Advise OWNER if additional data or services of the types <br />described in`paragraph 3.4. are necessary and assist.OWNER in obtaining <br />such data and services. <br />1.4. Final Design Phase <br />After written authorization to proceed with the Final Design Phase, <br />ENGINEER shall: <br />1.4.1. On the basis of the accepted preliminary documents and the <br />opinion of probable Total Project Costs prepare for incorporation in the <br />Contract Documents final drawings to show the general scope, extent and <br />character of the work to be furnished and performed.by CONTRACTOR(S) <br />(hereinafter called "Drawings ") and Technical Specifications. <br />1.4.2. Provide technical criteria, written descriptions and design data for <br />OWNER'S use in obtaining approvals of such governmental authorities as <br />have jurisdiction to approve the design of the Project, and assist OWNER <br />in consultations with appropriate authorities. <br />1.4.3'. Advise OWNER of any adjustments to the latest opinion .'of <br />Probable Total Project Costs caused by changes in'general scope, extent <br />or character or design requirements of the Project or Construction Costs. <br />Furnish to OWNER a revised opinion of probable Total Project Costs, <br />based on the Drawings and Specifications. <br />1.4.4. Prepare for review and approval by OWNER, its legal counsel and <br />other advisors contract agreement forms, general conditions, and <br />supplementary conditions, and bid forms, invitations to bid and <br />instructions to bidders and assist in the preparation of other related <br />documents. <br />1.4.5. Furnish two copies of the above documents and of the Drawings <br />and Specifications. and present and review them in person with OWNER. <br />Three additional copies will be furnished by the ENGINEER to the <br />appropriate review agencies. <br />Page 2 of 17 Pages <br />• ". r :e.,. pia -< � k� t. �' ,f <br />ti1 t.`. <br />