My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990
City-of-Paris
>
City Council
>
Minutes
>
1990-1999
>
1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2015 12:39:52 PM
Creation date
9/2/2015 12:30:58 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
632
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Part III - Budget Information Continued <br />(Pages CJD -10 through CJD -14) <br />Schedule A (Page CJD -10) <br />Comply with instructions on page CJD -10. <br />Enter staff positions of the applicant agency. <br />Enter monthly or annual percentage rate or flat amount rate per person for <br />each fringe benefit listed. <br />Schedule A Supplement (Page CJD -10.1) <br />If any of the staff positions listed on Schedule A (page CJD -10) indicate less <br />than 100 percent (of a 40 hour week) as being devoted to this grant project, <br />page CJD -10.1 must be completed to provide the supplemental information <br />described therein. In all other circumstances, leave this page blank, <br />Schedule B (Page CJD -11) <br />Comply with instructions on page CJD -11. <br />" r <br />Include all professional personal services/ consultant contracts. <br />Do not include services /products such as rent; telephones; equipment; <br />janitorial; vehicle lease; printing; copier lease; equipment maintenance; <br />temporary- agency employees, etc. <br />Where grant projects, in whole or in part, will be operated by :a third party <br />under contract to the grantee, all costs payable to that contractor should <br />be summarized in Schedule B and should be supported by detailed information <br />(of the contractor's expenses) comparable to the detail and. form solicited in <br />Schedules A. B, C, D, E, F, and G. Those Schedules, A, B, C, D, E, F, <br />and G, which are applicable may be used to present the required detailed <br />information or plain paper typewritten pages presenting the same degree of <br />detail may be used. If the indirect costs (Schedule G) that are allowable for <br />the grant will be paid to the contractor, those costs must be included in the <br />contract shown in Schedule B and are subject to the required matching ratio <br />for the grant. ' <br />Schedule B Supplement (Page CJD -11.1) <br />If the program described in the grant application is to be operated by a third <br />party organization, under contract from the grantee, page CJD -11.1 must be <br />completed to show the sources and amounts of all revenue received by the <br />contractor organization. In all other circumstances, leave this page blank. ' <br />Schedule C (Page CJD -12) <br />Comply with instructions on page CJD -12. <br />Local travel includes the area in which the project operates. <br />Revised January 1990 <br />
The URL can be used to link to this page
Your browser does not support the video tag.