My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989
City-of-Paris
>
City Council
>
Minutes
>
1980-1989
>
1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2015 12:47:37 PM
Creation date
9/2/2015 12:42:18 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
771
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
" f A ft,_a " "f <br />proof, OWNER and CONTRACTOR agree that as liquidated damages for delay <br />(but not as a penalty) CONTRACTOR shall pay OWNER one hundred fifty <br />and 00 /100 dollars ($150.00) for each day that expires after the time <br />specified in paragraph 3.1 for Substantial Completion until the Work <br />is substantially complete.. After Substantial Completion, if CONTRAC- <br />TOR shall neglect, refuse or fail to complete the remaining Work <br />i within the Contract Time or any proper extension thereof granted by <br />OWNER, CONTRACTOR shall pay OWNER fifty dollars ($50.00) for each day <br />that expires after the time specified in paragraph 3.1 for completion <br />and readiness for final payment. <br />Article 5. PAYMENT PROCEDURES. <br />CONTRACTOR shall submit Applications for Payment in accordance with <br />Article 14 of the General Conditions. Applications for Payment will <br />be processed by.ENGINEER as provided in the General Conditions. <br />5.1 Progress Payments. No progress payments will be-made on <br />this project. One payment, Final Payment, will be made upon the <br />satisfactory completion of the project.. <br />5.2 Final Payment. Upon final completion and acceptance of the <br />Work in accordance with paragraph 14.13 of the General Condi- <br />tions, OWNER shall pay the remainder of the Contract Price as <br />recommended by ENGINEER as provided in said paragraph 14.13. <br />Article 6. INTEREST. <br />No interest will be paid to the CONTRACTOR on retained money unless <br />required by law. <br />Article 7. CONTRACTOR'S REPRESENTATIONS. <br />In order to induce OWNER to enter into this Agreement, CONTRACTOR <br />makes the following representations: <br />7.1 CONTRACTOR has familiarized itself with the nature and <br />extent of the Contract Documents, Work, site, locality, and all <br />local conditions and Laws and Regulations that in any manner may' <br />affect cost, progress, performance or furnishing of the Work. <br />7.2 CONTRACTOR has studied carefully all reports of explorations <br />and tests of subsurface conditions and drawings of physical <br />conditions which are identified in the Supplementary - Conditions <br />as provided in paragraph 4..2 of the-General Conditions, and <br />accepts the determination set forth in paragraph SC -4.2 of the <br />Supplementary Conditions of the extent of the technical data <br />contained in such reports and drawings upon which CONTRACTOR is <br />entitled to reply. <br />7.3. CONTRACTOR has obtained and carefully studied (or assumes <br />responsibility for obtaining and carefully studying) all such <br />examinations, investigations, explorations, tests, reports and <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.