Laserfiche WebLink
:: hey d'anx <br />•. _ _ ��- <br />4•� <br />of ;Paragraph I -B above, whichever occurs first, the City <br />agrces to furnish LCWSD at the points of delivery and <br />subject to the Flow limitations as shown by Exhibit "A" <br />attached hereto, potable treated water in such quantities as <br />may be required by LCWSD to a maximum of 750,000,000 gallons <br />in any consecutive twelve (12) month period. Such water to <br />be taken at a uniform rate not to exceed 2050 gallons per <br />minute, in accordance with Schedule shown on. Exhibit "h" <br />hereto attached. <br />B. During this interim period of time the charge <br />for water from the City to LCWSD shaft be the actual cost of <br />water production operation and maintenance, water dis- <br />tribution operation and maintenance, 57.42 of the annual <br />interest on and fiscal agent fees associated with City of <br />Paris, Texas Waterworks and Sewer System Revenue Refunding <br />Bonds Series 1983, and 62.0% of the annual interest on and <br />fiscal agent fees associated with City of Paris, Texas <br />Combination Tax sand, Utility System Revenue Certificates of <br />Obligation, Series 1984 multiplied by the percentage that <br />water taken by LCWSD is of the total treated water sold by <br />the City of Paris plus 6.50 of the sum of such actual costs. <br />The method of computing such charges shall be the same as <br />illustrated and comply with subparagraphs 5, 6 and 7 of <br />Paragraph V and is illustrated in Exhibit "B" attached <br />hereto. <br />3 <br />r <br />