My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1983
City-of-Paris
>
City Council
>
Minutes
>
1980-1989
>
1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2015 9:01:00 AM
Creation date
9/2/2015 1:23:23 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROFESSIONAL SERVICE CONTRACT <br />STATE OF TEXAS § <br />COUNTY OF LANAR § <br />That the CITY OF <br />corporation, acting by <br />hereinafter referred to <br />5630 Yale Boulevard, Da <br />referred to as ENGINEER <br />EXHIBIT "A" <br />KNOW ALL MEN BY THESE PRESENTS: <br />PARIS, Paris, Texas, a municipal <br />and through its Mayor, Joe Grzham, <br />as CTTY and HUNTER ASSOCIATES, TNC., <br />Llas; Texas, 75206 -5081, hereinafter <br />do contract and agree as follows: <br />1. The CITY wishes to procure and the ENGINEER <br />desires to provide professional services for the purpose of <br />acquiring a Solid Waste Type 5 Permit and to construct a <br />transfer station in compliance with State of Texas Health <br />Department criteria for which CITY agrees to pay as herein- <br />after stated. <br />�i <br />2. The professional services to be provided by <br />ENGINEER are as follows: <br />A. Preliminary Design- Permit Phase. <br />(1) Attend conferences with CITY and other <br />parties interested in the project. <br />(2) Investigate alternative solid waste transfer <br />system designs. Identify alternatives <br />including cost estimates and make recommenda- <br />tions to CITY as to the alternative most <br />likely to satisfy CITY's needs. <br />(3) Based on preliminary investigations identify <br />a primary site for the project. <br />(4) Obtain all necessary investigations, surveys <br />and tests including, but not limited to soil <br />and foundation investigations, which, in <br />accordance with good engineering practices, <br />.ire required for proper design of the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.