My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003
City-of-Paris
>
City Council
>
Minutes
>
2000-2009
>
2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2017 10:41:07 AM
Creation date
9/2/2015 3:38:16 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1895
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
451 <br />r <br />Yearsibil 61 <br />157 -YOIi <br />January 8, 2003 <br />Mr. Shawn Napier, City Engineer <br />City of Paris <br />P.O. Box 9037 <br />Paris, TX 75461 -9037 <br />Re: Addendum No. l to the Agreement for Engineering Services <br />Water System Improvements <br />Dear Mr. Napier: <br />Bucher, Willis and Ratliff Corporation (BWR) is requesting that Addendum No. I to the Engineering <br />Services Agreement between the City of Paris and BWR be approved by the Paris City Council. This <br />Addendum provides for construction observation and material testing of the Elevated Water Storage <br />Facility and the 24" RCCP Water Transmission Line. Procedures will include the following: <br />Elevated Water Storage Facility: Field observation of foundation reinforcing steel <br />Field observation of support column reinforcing steel <br />Testing of concrete in the foundation and column <br />Field observation of steel preparation <br />Field observation of welding during tank construction <br />Field x -rays of joint welds <br />Field observation of steel preparation for coating application <br />Field observation of coating application <br />Field testing of coating thickness as per specifications <br />Water Transmission Line: Collection of soils samples and lab testing of material <br />Field analysis of lime stabilization materials and soils <br />Field density and moisture testing of compacted materials <br />The estimated cost of performing these procedures, including administrative and subcontractor costs, is <br />$89,981.00. Services associated with this Addendum will be based on an hourly cost basis for all items. <br />It is requested that a budget of $90,000.00 be approved as a part of Addendum No. I to cover the costs of <br />these tasks. If you are in agreement with the terms listed, please sign and return one copy for our records. <br />Very truly yours, <br />BUCHER, WILLIS & RATLIFF CORPORATION CITY OF PARIS, TEXAS <br />Kevin D. Newman, P.E. <br />Principal /Executive Vice President <br />KDN:ma <br />Michael E Malone <br />City Manager <br />EXHIBIT <br />ENGINEERS / PLANNERS 1 ARCHITECTS <br />601 Sri i i it Dimi , Sum 202 1 Tm k, Ti \A v 75701-94 19 1 Ili a ,m : 90 1.581 • "844 1 FAR: 903.581 901711 <br />
The URL can be used to link to this page
Your browser does not support the video tag.