Laserfiche WebLink
I <br />� 9(�s �9•ai'y�� � a ��fii✓s• #� x"sk� %i, 4+" �;q Pk - <br />`ut <br />2. GUARANTY AGAINST`DEFECTIVE WORK: r the Contractor shall indemnify the <br />rpr° owner "against any repairs which may become necessary to any part of <br />work performed under this contract, 'arising from defective workmanship <br />u' or materials used therein, for a period of one (1) year from the date <br />of final acceptance of the work. <br />3. CLEANUP: At the conclusion of the work, all tools, temporary struc- <br />tures and materials belonging to the Contractor shall be promptly <br />removed and all dirt, rubbish and other foreign substances shall be <br />disposed of. <br />4. INSURANCE: The Contractor shall maintain such insurance as will protect <br />him and the Owner from claims under Workman's Compensation Acts and <br />from any other claims for damages for personal injury, including death, <br />which may arise from his operation he, by himself, or by any subcontractor <br />or anyone directly or indirectly employed by either of them. Certifica- <br />tion of such insurance shall be filed with Owner. Coverage shall be as <br />follows: <br />(a) Workman's Compensation Insurance and Employer's Liability Insurance <br />shall comply with State Laws and with minimum limits of $100,000.00. <br />(b) Contractor's public liability with limits not less than $100,000.00 <br />each person, $300,000.00 each accident and property damage with <br />limits not less than $100,00.00 each accident, $200,000.00 aggregate. <br />The insurance hereinbefore specified shall be covered until all work re- <br />quired to be performed under the terms of the contract is satisfactorily <br />completed or evidenced by formal acceptance by the Owner. <br />5. The Contractor shall commence work within Ten (10) days after the date <br />of written notice to do so, and complete the work on which he has bid <br />within Forty -five (45) calendar days. <br />