My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1978
City-of-Paris
>
City Council
>
Minutes
>
1974-1979
>
1978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2015 9:08:20 AM
Creation date
9/3/2015 9:08:14 AM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(5) In tile . event that the City requests additional operation <br />and maintenance y' `° the water supply stor. p over and above that <br />determined by the Contracting; Officer and over and alcove that <br />which formed the basis for determination as set out in Exhibit A, <br />the City shall bear the entire co ,t of such additional expense. <br />C. Major Capital Replacement Cots. <br />(1) Present Use. The City shall pay 4.22 percent 'o€ the <br />cost of major capital replacements and sedimentation resurvey., <br />when incurred. ' <br />(2) Future Use. As the storage for future water .supply <br />demands is used, the share of the major capital replacements <br />and sedimen- Cation resurveys, which tine City will be required to _ <br />ray, trill be increased cor..merts.urate with the percentage of.- the <br />future.water supply storage being; used, ur to a total of <br />10.526 percent of such costs. <br />(3) Pa npnt. Payment shall be made either in lump sum on <br />demand at the time costs are incurred or annually with interest <br />on the unpaid. balance. If paid annually,- the Cityt.s share -shall <br />be paid within the life of the Project in not to exceed.25 . <br />consecutive annual installments'with - the first payment to be made <br />with the first annual payment on the Project investment costs <br />becoming due .after the date said major capital replacement costs <br />are incurred. Annual payrents thereafter will be due and payable <br />on said anniversary date._ All annual payments for replacement of <br />joint use items- shall include accrued interest on the unpaid <br />balance. at the interest rate computed in accordance with the Water <br />` supply Act of 1953 as of -tile beginning of the fiscal year in which_ the <br />major capital replacement is initiated. <br />The last annual payment shall be adjusted upward or_ downi-iard wh <br />en <br />. <br />r it <br />h in the assure repayment. of all the Xncurred c ost. w <br />- . <br />repayment period.'... <br />d.. Delinquent Payments. if the City shall fail to make any <br />of the aforesaid payments when due, then the delinquent payments shall <br />bear interest, conT.ounded' annually, until paid. The interest-- rate to <br />% be used for delinquent payments shall be as established by the Secretary <br />of the Treasury'on the basis of the slater Supply Act of 1958, as amended, <br />as of the beginnin- of the Government fiscal year in which each period of <br />delinquency occurs. The amount charged on payments overdue <br />for a period of less than one year shall be figured on a monthly <br />basis. For ex-ample, it the payr -ent is made within the first month <br />after being overdue (31. to 60 days after the anniversary date) , <br />
The URL can be used to link to this page
Your browser does not support the video tag.