Laserfiche WebLink
I -- 'RESERVOIR. STOPACK' <br />Percent of <br />Usable <br />Water Supply <br />Feature <br />Elevation <br />Storage(I <br />Storage.' <br />(f t. in. S. l.) <br />(ac� -f t) <br />. <br />Flood Control Storage. <br />460.5 -451.0 <br />64,500 `. <br />tinter Supply Storage <br />.451.0 -415.0 <br />109,600. <br />100.06 <br />City of Paris, Texas <br />109,600 <br />100.0 <br />Present use <br />Storage Space No. 1 <br />21,960 <br />20.00 <br />Storage Space No. 2 <br />21,900 <br />20.00 <br />Future use <br />65,800 <br />60.00. <br />TOTAL <br />174,100 <br />(1} Storage remaining <br />after 10.0 years <br />of sedimentation, beginning, <br />'. from the date the Project b ecame 'operational, l October 1967. <br />II -=' <br />(2) ` <br />ALLOCATIO:d OF ACTUAL COST <br />Flood Control <br />$19,562,775 <br />Water Supply <br />Storage <br />3,093,407 <br />Conduit <br />7,000 <br />Recreation <br />49,601,906 <br />Fish and Wildlife <br />- 82,328 <br />TOTAT. <br />$9,347,.4.16 <br />(2) Excludes $105,000 <br />nonreimbursable <br />costs- for relocation <br />of roads above <br />replacement --in -kind standards. • Includes $251,334 <br />for the value of federally <br />owned lands. Total cost of Project is <br />$9,452,416. <br />10 <br />