My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1974
City-of-Paris
>
City Council
>
Minutes
>
1974-1979
>
1974
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2015 9:13:26 AM
Creation date
9/3/2015 9:13:21 AM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15 <br />SPECIAL REQUI REME ITS <br />E. CHERRY STREET <br />20th -25th St. N.E. <br />1) The contractor is bidding the curb and gutter and the construction of the drive- <br />ways. All prices are unit prices and the actual measurements will- be only con- <br />sidered for payment. <br />2) The City of Patis Street Departt:ient will grade the area where the curb and gutter <br />is located, fill with-8" I*tite Rock Materials, Compact, and have the site ready <br />for the contractor to construct the curb and gutter. The contractor should <br />realize that the Street Department Work night be off two inches, and in this case <br />the contractor will adjust the grade to the fortis. If additional materials are <br />needed, the city will provide the materials to the site of the job with no cost <br />to the contractor. <br />3) The contractor is to fill behind the curb and adjust the grade to the adjacent <br />property. Fill materials to be approved by the City Inspector. <br />4) The time of completion is the essence of this contract. The contractor will be <br />charged liquidation damages in the amount of $50.00 for each day after the date <br />specified on the Proposal for the completion of said work.. <br />5) The contractor should make it available to the owners to get in and out of their <br />residence at.all times. <br />6) All work to be in accordance with the City of Paris Ordinance 1365. <br />7) The contractor should use barricades, lights, and warning signals during the life <br />of his contract to avoid traffic hazzards. <br />8) The contractor should have Liability Insurance and Damage Insurance in accordance <br />with the City of Paris current requirements to release the City and hold harmless <br />in the event of accident. <br />9) The contractor should comply with all Federal, State, and City Laws and Ordinances <br />in performing this job. <br />
The URL can be used to link to this page
Your browser does not support the video tag.