Laserfiche WebLink
Item. <br />Contract <br />Change in <br />Revised <br />Description <br />Unit <br />Quantity - <br />Quantity <br />Quantity <br />24 <br />I3 -Inch Concrete Curb <br />L_F_ <br />.44 <br />- 44 <br />and Gutter <br />25 <br />Remove Feisting 18 -Inch <br />L -F_ <br />44 <br />- 44 <br />0 <br />Concrete Curb & Gutter <br />- <br />26. <br />- Medium Intensi.ty Ruaway <br />Ea_ <br />5S <br />-E 2 <br />60 <br />Lights, J%aie iounted <br />31 <br />Two -day linde,grqund. <br />L_F_ <br />225 <br />- 225 <br />- Q <br />_.. I ec.4ri cal 3. uc-' <br />34 <br />Ai sport Taxi. Guidance <br />Unit <br />8 <br />- 2 <br />6 <br />Stns <br />39 <br />U ^e- ground Cable In- <br />L_F. <br />2,.51.0 <br />-- 450 <br />2 000 <br />s t-alled in Duct or <br />Con du? t <br />41 <br />Reconstructing Salvaged <br />L_F_ <br />1,000 <br />- 1,000 <br />0 <br />Ba?'oed :dire Fence and <br />_ <br />:etas.. Foss <br />42 <br />Furnishing and Inst-all- <br />L_F_ <br />1,500- <br />- 1,500 <br />?g Barbed Wire Fence <br />With Metal Posts <br />.4- EFFECT 3 CHANIGE <br />The <br />effect of the change is swc ari.zed <br />as iollo'vs_ <br />{ <br />Original <br />Change In <br />Revised <br />Item No <br />Contract Amo a t <br />Contract Amount <br />Cortraat An, ount <br />2 <br />$70,152.10 <br />+ $ 41,527_00 <br />$111,67a_lQ <br />3 <br />71,325.00 <br />- 71,325 -00 <br />0_00 <br />4 <br />16,3`-4.04, <br />- - 3,248..19 <br />13,124.85 <br />5 <br />13,032 -00 <br />- 3,762_00 <br />9,270_00 <br />6 <br />45,625 -00 <br />-- 7,975.25 <br />37,649_75 <br />7 <br />4,581_60 <br />- 778_80 <br />3,802 -80 . <br />8 <br />4,804 -80 <br />847.60 <br />3,957.20* <br />9 <br />9,893.50 <br />- 838_50 <br />9,000_00 <br />10 <br />2,240.00 <br />- 525_00 <br />1,715_00 <br />11 <br />450.00 <br />- 30_00 <br />420.00 <br />12 <br />1,400.00 <br />- 200_00 <br />1,209_00 <br />13 <br />3,150.00 <br />- 690_00 <br />2,460_00 <br />16 <br />4---,801.22 <br />- 4,831. -2c3 <br />0 -00 <br />