My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1976
City-of-Paris
>
City Council
>
Minutes
>
1974-1979
>
1976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2015 9:36:29 AM
Creation date
9/3/2015 9:36:23 AM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAGE 3 <br />629 <br />of the contour interval. The elevation of ninety percent (90 %) <br />of the spot heights shall be accurate within one - fourth of <br />the contour interval <br />E. Drafting at match.lines shall agree between sheets within 0.02 <br />inch. <br />6. Data to be Furnished to Contractor.. The City shalt cooperate wiE <br />i <br />the Contractor in every way possible and hereby agrees to supply the Contr -actor <br />with all inhouse data and information about the planning area, without cost <br />to.the Contractor. <br />7.` Time of Performance. The services of the Contractor are to commence <br />i as. "soon -as practicable after the execution.-of this Contract and shall be <br />undertaken.and completed in such sequence as to assure their expeditious <br />completion in the. -1 i ght of the purposes of this' Contract, but In any event <br />all of the services required hereunder shal i be completed on or before June <br />30, 1976 <br />8. Compensation. The City agrees to pay the Contractor the total sure <br />of $5,758.00 for_the services. <br />9. Method of Patent. The City will pay the Contractor the total sum <br />of $5,758.00 when the services have been satisfactorily completed as deter- -` <br />mined by the.City. The total sum of $5,758.00 paid to the Contractor shall <br />I constitute full and complete compensation for services rendered. <br />.It is expressly understood and agreed that in no event will the total <br />compensation.and reimbursement, if any, to be paid hereunder exceed the max- <br />imum of $5,758.00. <br />10. Termination of Contract for Cause: If,'.through any cause, the Con- <br />tractor shall fail to.fulfill in a Aimely and proper manner its obligations <br />under this Contract, or. if the-Contractor shall. violate any of the covenants', <br />agreements, or stipulations of this Contract, the City shall thereupon have <br />the right to terminate this Contract by giving written notice to the Contractor <br />of such termination,'specifying the effective date thereof, at least 5 days <br />before the effective date of such termination. in that event, all. finished <br />or, unfinished documents, and other materials described in paragraph 4 above, <br />prepared by -the Contractor under this Contract shall, at the option or the <br />City, become its property, and the Contractor shall be entitled to receive <br />
The URL can be used to link to this page
Your browser does not support the video tag.