My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-036 - Turner Industries tax abatement
City-of-Paris
>
City Clerk
>
Resolutions
>
2011-2020
>
2015
>
2015-036 - Turner Industries tax abatement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 10:50:49 AM
Creation date
9/30/2015 2:47:06 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - Date
9/14/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. <br />Term <br />1.1 The effective date of this AGREEMENT is the 14'' day of September, 2015, with <br />tax abatement beginning with the tax year commencing January 1, 2016, and expiring on <br />December 31, 2025. <br />II. <br />Area to be Improved <br />2.1 The Project consists of a new office building to be constructed on Owner's land <br />inside Reinvestment Zone No. 2015 -2 as depicted in the Site Plan attached hereto as Exhibit B. <br />The land and proposed building are hereinafter referred to as the "Property." <br />III. <br />Improvements <br />3.1 Owner shall construct a first class office building on the Property with appropriate <br />office furnishings no less than 25,400 square feet in size, at a minimum capital investment of <br />SIX MILLION AND NO 1100 DOLLARS ($6,000,000.00) (hereinafter "Improvements "). The <br />office building will be constructed in compliance with all local, state and federal codes and <br />regulations; all required permits shall be obtained by Owner prior to beginning construction of <br />the Improvements and all required inspections shall be timely scheduled and completed by <br />Owner in accordance with City Building Codes, International Building Codes and all other <br />applicable state and federal laws and regulations. <br />3.2 The Office Building described herein as the "Improvements" shall be completed, <br />furnished, and occupied within twenty -four (24) months of the effective date of this Agreement. <br />Owner shall provide City with a Certificate of Completion along with supporting documents as <br />described in Section 10.1 of this Agreement within sixty (60) calendar days of completion of the <br />Improvements. <br />IV. <br />Consideration <br />4.1 Owner agrees and covenants that it will diligently and faithfully, in a good and <br />workmanlike manner pursue the completion of the Improvements as described herein. As good <br />and valuable consideration for this Agreement, Owner further covenants and agrees that all <br />construction of the Improvements will be in accordance with all applicable state and local laws, <br />codes and regulations or will procure a valid waiver thereof. In further consideration for this <br />Agreement, Owner shall continue to operate an active and vibrant pipe fabrication, coating, <br />design and engineering and construction plant at Owner's current location in Paris, Texas <br />throughout the term of this Agreement. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.