My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
24 - CONSTRUCTION INSPECTIONS
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2015
>
11 NOVEMBER
>
11/16/2015
>
24 - CONSTRUCTION INSPECTIONS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 9:48:54 AM
Creation date
11/12/2015 12:51:27 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 24 <br />memorandum <br />TO: Mayor & City Council <br />FROM: John Godwin, City Manager <br />SUBJECT: CONSTRUCTION INSPECTIONS <br />DATE: November 9, 2015 <br />BACKGROUND: In July the city council instructed staff to create an RFP for inspection <br />services. On August 31 four firms were interviewed by the council, and Lochner was selected as <br />the preferred vendor. Following the receipt of a proposed scope of work and pricing, we began <br />negotiating a final contract. <br />STATUS OF ISSUE: The initial proposal from Lochner was for $1,730,592, which we thought <br />was significantly too high, and included some project management tasks. Although we <br />understood Lochner's desire to provide more management over a project for which they would <br />be responsible for all inspections, we could not justify the added expense and duplication of <br />effort. After a couple of rounds of meetings, Lochner reduced their proposal to $1,477,320. <br />More recently, we succeeded in reducing their price a bit more, down to an amount not to exceed <br />$1,353,934. The "amount not to exceed" is especially important in this case since we fully <br />expect to manage the project tightly enough that they will not need to use all the hours projected. <br />At this point, the cost to review B -1 is $15,878, the cost for B -2 (which is underway) is <br />$127,695, and the cost for Package 4 (the bid for which opens on November 17) is $968,378. <br />Reimbursable expenses, such as lodging meals, mileage, etc. total another $242,058. <br />Another issue over which we have expressed concern is the specific Lochner personnel proposed <br />to do the actual work. We requested and reviewed their resumes, and although they are highly <br />qualified inspectors, almost all of their work has been on roads and bridges, with utilities as only <br />a tangential part of their work. We have agreed to use them initially, but have advised Lochner <br />that we reserve the right to require the replacement of one or the other, or both. <br />BUDGET: Will be paid from 2013 bond proceeds. <br />RECOMMENDATION: Approve agreement for inspection services with H. W. Lochner, Inc. in <br />an amount not to exceed $1,353,934.45. <br />
The URL can be used to link to this page
Your browser does not support the video tag.