My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
21 - Award contract to B Bray - Clarksville St. Water Line Project
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2015
>
12 DECEMBER
>
12/14/2015
>
21 - Award contract to B Bray - Clarksville St. Water Line Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2015 2:55:43 PM
Creation date
12/10/2015 2:43:15 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 21 <br />memorandum <br />TO: City Council <br />John Godwin, City Manager <br />FROM: Jerry McDaniel, Public Works Director <br />SUBJECT: CLARKSVILLE ST. WATER LINE PROJECT <br />DATE: November 19, 2015 <br />BACKGROUND: First United Methodist Church is constructing expansions and improvements <br />to a multi - purpose youth facility located east of their main sanctuary building. The most <br />efficient manner to supply the new fire sprinkler system for the expanded building is off <br />Clarksville, where there is currently insufficient water pressure. Fortunately the water line on <br />Clarksville to which the church wants to connect is planned for replacement as part of Package 4. <br />That work will not begin in a timely manner though, and would cause some of the new work at <br />the church to be damaged. Therefore, we have taken that single segment out and bid it as a <br />separate project to be built immediately. <br />STATUS OF ISSUE: We advertised this sub - project for bids, with the bid opening on <br />November 13. We received two qualified bids: B Bray Construction for $66,151, and S &S <br />Boring for $71,577. Both are qualified contractors, and the prices were within our estimate for <br />the work. <br />BUDGET: Funding available in 2013 utility bond proceeds. <br />RECOMMENDATION: Award bid to B Bray Construction in the amount of $66,151. <br />
The URL can be used to link to this page
Your browser does not support the video tag.