My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13 - FLEA MARKET
City-of-Paris
>
City Council
>
Agenda Packets
>
2011-2020
>
2016
>
04 APRIL
>
04/25/2016
>
13 - FLEA MARKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2016 3:53:04 PM
Creation date
4/21/2016 10:32:40 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Separation of occupants in the assembly area from the warehousing of goods or <br />merchandise is required. <br />6. Area where drop ceiling tile is provide prevents the vertical travel of fire spread. So the <br />tiles missing should be replaced and the tiles that are not positioned or seated correctly in <br />grid need to be corrected. <br />7. Kitchen area is conducting commercial cooking that produces grease laden vapors, and <br />requires vent a hood, with fixed suppression system and a type K extinguisher. <br />Ail violations in this report are violations of International Fire Code 2006 3rd printing 2007 and its <br />referenced codes and standards as adopted by the City of Paris Ordinance NO. 2010-028. <br />Clyde Crews 1269 <br />Fire Marshal City of Paris <br />
The URL can be used to link to this page
Your browser does not support the video tag.